Topic | Recent |
---|---|
Shaded roofEBOM-2009 SSc7.2: Heat island effect - roofposted by wayne hendrickson on Aug 5, 2010, 6:26 pm
If the shaded... Last reply: Tristan Roberts, Aug 5, 2010, 6:53 pm |
|
Major Renovation on Military BarracksNC-2009 SSc2: Development Density and Community Connectivityposted by Mike Phelps on Aug 2, 2010, 9:22 am
We are responding to an RFP for major renovation of existing barracks. The barracks themselves exceed the... Last reply: Larry Jones, Aug 5, 2010, 6:41 pm |
|
LEED for schools 2007 EQp3Schools-2009 IEQp3: Minimum Acoustical Performanceposted by Breana Detzler on Aug 4, 2010, 3:43 pm
We are currently calculating our sound absorption coefficients for LEED for Schools 2007 EQ Prerequsite 3 and have formulated a couple questions. 1: Should we include built-in casework in... Last reply: Joseph F. Bridger, Aug 5, 2010, 4:10 pm |
|
window areaCI-2009 IEQc8.1: Daylight and views - daylightposted by kelvin duen on Jul 30, 2010, 2:19 pm
I realized the answer for my second question. Heres another one. This is more for verification. I am unsure if it is the same for CI v3 but in the reference guide for CI v2 it states that "window... Last reply: Jill Perry, PE, Aug 5, 2010, 2:54 pm |
|
Office Building with Restaurant/KitchenNC-2009 WEp1: Water Use Reductionposted by Tatjana Ernst on Apr 27, 2010, 4:52 am
We have a office building with a restaurant/kitchen. Do i have to calculate the water consumption in the kitchen? I understand the reference guide like that we only have to calculate the water... Last reply: Patrick Moore, Aug 5, 2010, 1:09 pm |
|
Step 8- Verify the installation and performanceNC-2009 EAp1: Fundamental Commissioning of Building Energy Systemsposted by Fabio Frescia on Aug 3, 2010, 10:22 pm
Dear all, Last reply: Chris Ladner, Aug 5, 2010, 11:15 am |
|
tenant scopeGeneral forumsposted by Tristan Roberts on Aug 5, 2010, 10:21 am
Andreas, the LEED-CI certification process covers spaces that are within the tenant scope of work, not "... |
|
Pilot credit AvailabilityPilot-Credits PC2: PBT Source Reduction: Dioxins and Halogenated Organic Compoundsposted by Yong Lee Low on Aug 4, 2010, 11:44 pm
Currently, I am able to score 2 to 3 points under innovation through... Last reply: Tristan Roberts, Aug 5, 2010, 9:16 am |
|
Buildings to be built in stagesCS-2009 SSc5.1: Site development - protect or restore habitatposted by javier bolanos zeledon on Aug 2, 2010, 8:09 pm
For this credit and 5.2 Maximize Open Space. Last reply: Tristan Roberts, Aug 4, 2010, 11:20 pm |
|
About Design of IEQc8.1CS-2009 IEQc8.1: Daylight and views - daylightposted by Billy Ng on Jul 30, 2010, 12:46 am
I am working on core and shell project, building a data center. in order to get this credit, i need to have... Last reply: Tristan Roberts, Aug 4, 2010, 11:08 pm |