Topic | Recent |
---|---|
Is a single meter reading for a campus acceptable?EBOM-2009 EAc1: Optimize Energy Efficiency Performanceposted by Yong Lee Low on Jul 29, 2010, 11:46 pm
If the project is a 3 building campus,and I split the space types into 6-7 categories but my meter reading is just from a single feeding point i.e. just 1 meter for the entire campus ,will that... |
|
a good thing but not a LEED thingGeneral forumsposted by Tristan Roberts on Jul 29, 2010, 11:21 am
We recently had a sort-of similar post on the EAp2 forum. |
|
RE: LEED project boundary in campus settingGeneral forumsposted by David Posada on Jul 28, 2010, 7:00 pm
Daniel, |
|
Discrepancy between Reference Manual and TemplateCI-2009 EAc1.2: Optimize energy performance - lighting controlsposted by Amy Rider on Jul 26, 2010, 5:25 pm
I am seeing a discrepancy between the LEED template and the IDC reference manual for EAc1.2. Last reply: Amy Rider, Jul 28, 2010, 4:09 pm |
|
ExceptionsNC-2009 IEQc8.1: Daylight and views - daylightposted by Lauren Sparandara on Feb 4, 2010, 3:19 pm
Hello. What rooms exceptions have folks successfully passed? For instance, the hospital project I am working does not have daylight or views in some of its operating rooms, imaging rooms and exam... Last reply: Anne Nicklin, Jul 28, 2010, 2:43 pm |
|
LEED ID&C EA 1.3- 5 or 10 points for RP?CI-2009 RPc1: Regional Priorityposted by Abena Darden on Jul 28, 2010, 1:39 pm
In my project's zip code (94128), for LEED ID&C, EA 1.3 is listed as one of the RP credits. However, in ID&C there are two options for EA 1.3-- doing either gets 5 points, doing both... Last reply: Tristan Roberts, Jul 28, 2010, 1:43 pm |
|
DES vs purchased heat for 1! buildingNC-2009 EAc1: Optimize Energy Performanceposted by Nicolas Galiotto on Jul 26, 2010, 9:52 am
Hi Christopher, hi everybody, I've juste seen the two first posts on this page but it does not help. We are purchasing heat from a district heating plant (100% green). The USGBC's... Last reply: Christopher Schaffner, Jul 28, 2010, 8:38 am |
|
thoughts on the 5-year termination clause issueCI-2009 MRc1.1: Tenant space - long-term commitmentposted by Cara Mae Cirignano on Jul 27, 2010, 5:13 pm
Hi Kathy - Last reply: Philip Herriges, Jul 28, 2010, 8:13 am |
|
Multi-Residential building with less than 10% of retail areaCS-2009 WEp1: Water Use Reductionposted by MARIA GARCIA on Jul 14, 2010, 4:06 am
I am working on a multi-residential building with less than 10% of gross retail area in the ground floor. The project is under LEED CS and the owner will provide all fixtures for the multi-... Last reply: Karen Blust, Jul 28, 2010, 1:38 am |
|
Telecommuting & Energy StarEBOM-2009 SSc4: Alternative Commuting Transportationposted by Cody Gale on Jul 14, 2010, 6:31 pm
If our strategy for this credit involves mandating telecommuting for every employee once a week, which will reduce commuting trips by 20%, will we be required to adjust our Energy Star inputs (... Last reply: Dan Ackerstein, Jul 28, 2010, 12:13 am |