Forum quick links
Farmland of statewide importance
posted by Gaston Viau on
Submission schedule for multiple buildings
posted by Marcio Alberto Casado Pereira on
We are certifying 4 buildings on a campus. They all belong to the same owner and are being built under the same construction contract.
office vs. hotel
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by John Carino on
We are building a hotel and it seems many of the credits are focused on office buildings.
Conditioned floor
NC-2009 EAp2:Minimum Energy Performanceposted by Rodrigo Dias on
Hello I'm working on a project that has conditioned areas on 6 floors, but in two of those floors has only 5% of all conditioned area , can I consider these floors conditioned as the another floo
LEED ID+C
posted by Melissa Wrolstad on
This comment pertains to the LEED ID+C rating system, which still seems to be the little brother left at the grocery store in all this new rating system development. In credits marked final that w
MOB (Medical Office Building) LEED-NC or LEED-HC?
posted by Lauren Sparandara on
Hello, I am working on a project that is a medical office building. It has outpatient care (more than 60% of the area is outpatient) but it operates like an office space.
Parking garage
NC-2009 EAp2:Minimum Energy Performanceposted by PAWAN DAHIWAL on
I have modeled parking garage in the simulation by taking 0.75 cfm/sf (exhaust)from ASHRAE 62.1-2007 which leads to energy consumpation of 43,450kWh.
Core and Shell project including restaurant
CS-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Anna Korinkova on
Our project is a C&S building with a restaurant on the ground floor. A tenant has been already appointed but he wants to have his restaurant meant for smokers.
LEED and PPP
posted by Andreas M. Roessler on
Dear all, we have a PPP (Public Private Partnership) project and are not sure which system version to use.
EAp2
NC-2009 EAp2:Minimum Energy Performanceposted by George Bender on
The project is a railcar vehicle maintenance facility (VMF) a couple acres large. This project falls under new construction and includes a new rail track to be brought into the VMF.