Topic | Recent |
---|---|
What happened to Leadership?General forumsposted by Tim Murray on Oct 29, 2014, 11:36 am
The “L” stands for leadership. Every LEED version has been painful and caused market outcry, yet the market adapted and great progress was made. Keep in mind that LEEDv4’s original working title... Last reply: Brian Salazar, Oct 30, 2014, 4:57 pm |
|
Must non-potable water sources be used to earn IP credit?NC-v4 IPc1: Integrative processposted by Eesmyal Santos-Brault on Nov 6, 2014, 1:27 am
It appears that this credit can not be earned if a project does not meet some water demand through nonpotable sources. Can anyone confirm if not only consideration but actual use of nonpotable... Last reply: Marcus Sheffer, Aug 17, 2015, 4:02 pm |
|
Glazing (windows) area- VOCNC-v4 EQc2: Low-emitting materialsposted by Caroline PIN on Nov 10, 2014, 10:00 am
Dear all, Last reply: Caroline PIN, Dec 11, 2014, 11:20 am |
|
International ProjectsGeneral forumsposted by Marcus Sheffer on Nov 10, 2014, 11:46 am
I was wondering how much of the decision to delay was due to international uptake. A significant portion of LEED projects are from outside the US and I think these projects represent the biggest... Last reply: Andrew Carman, May 14, 2015, 9:26 am |
|
ENERGY STAR UPS- 160KW and 480VCI-2009 EAc1.4: Optimize energy performance - equipment and appliancesposted by Carla Lopez on Nov 19, 2014, 4:34 pm
Hi, It is of my best understanding that the UPSs are included as "eligible equipment" for both EAp2 and EAc1.4 as stated on the LEED for Commercial Interiors v2009 Reference Guide since... Last reply: Danna Richey, Nov 8, 2018, 2:55 pm |
|
Laboratory 90.1 ModelingNC-2009 EAc1: Optimize Energy Performanceposted by Victoria Watson on Dec 4, 2014, 11:23 am
Hi, Last reply: Marcus Sheffer, Mar 4, 2015, 2:52 pm |
|
Powder coating mixed with waterNC-v4 EQc2: Low-emitting materialsposted by Caroline PIN on Mar 4, 2015, 7:51 am
Dear all, Is powder coating mixed with water on the jobsite is wet applied products ? technically, the initial product is powder, it is not "wet". Is difficult to get information about... Last reply: Afogreen Build, Jul 4, 2024, 5:59 am |
|
Reviewr's Comment is requesting labor and deliveryCI-2009 MRc4: Recycled Contentposted by Sarah Thompson on Mar 6, 2015, 4:34 pm
In all my 40 LEED projects I have never included labor and delivery to a material's cost total. I received the following comments and am at a loss as to how to respond: Let me also be... Last reply: RETIRED, Mar 9, 2015, 10:57 am |
|
Energy Modeling In a High bay Industrial area + OfficeNC-2009 EAp2: Minimum Energy Performanceposted by Marcelo Maciel de Santa Helena on Apr 7, 2015, 11:07 pm
What’s the best way to proceed with the energy model of the following case? Last reply: Marcus Sheffer, Apr 9, 2015, 10:11 am |
|
Yet another exhaust questionNC-2009 EAc1: Optimize Energy Performanceposted by Lawrence Lile on Apr 17, 2015, 5:54 pm
We've got an 11,000 square foot maintenance garage for trucks, modeling it under LEED and ASHRAE 90.1-2007. This is a tricky space. It has more than 15 BTUH/SFT of heat so according to... Last reply: Marcus Sheffer, Apr 20, 2015, 11:42 am |