FAQs about EAp2 :

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

Mechanical Room part of gross square footage

How can a mechanical room that is semiopen with no AC but housing the chillers be part of the gross square footage of a project for the purpose of assigning baseline LPD, or would it be consider part of any tradable or non-tradable spaces?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Thu, 01/03/2013 - 14:58

Read the definitions of spaces in 90.1. A vented space is still an enclosed space. If it is an enclosed space then it counts. Assume it has lighting and it does not fit any of the exterior lighting categories so why exclude it as interior lighting?

Thu, 01/03/2013 - 15:05

I mean it's a chiller room with no roof, it has walls but no roof, it's basically open, it has lighting in it, but it does not actually fit to the exterior lighting categories either.

Thu, 01/03/2013 - 15:35

Well that would be outside space as it sounds like an enclosure for the outdoor condensing equipment. It would not count as interior without a roof. I would likely count it under Tradable - Building Grounds as nothing else fits.

Add new comment