CI-2009 WEp1:Water Use Reduction—20% Reduction

What is WEp1-1, plumbing fixture and fitting schedule?

In the summary of the online table it says, Upload WEp1-1. "Provide the plumbing fixture and fitting schedule for the project highlighting flush and flowrates for all applicable plumbing fixtures and fittings within the tenant space that meet the needs of tenant occupancy." Is there a format for this?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Fri, 12/28/2012 - 19:44

Hi Diana, No, typically the plumbing fixture schedule is found on the plans. You can just upload that plansheet. We tend to use product cutsheets, since schedules can vary in terms of the information provided. Reviewers tend to prefer the fixture schedule for some reason. Either should work, but if you use cutsheets you might provide a quick explanation as to why.

Fri, 12/28/2012 - 20:37

Thank you, Michelle. I think maybe we will upload the product data cutsheets.

Thu, 01/03/2013 - 17:04

Hi Diana, The reviewer is requesting the plumbing fixture schedule for the project as part of the required documentation to verify that the fixtures listed in the form were specified for the project. A copy of the plumbing fixture schedule from the project's construction documents, outlining detailed information for each flush and flow fixture specified (including fixture manufacturer, model number and flow rate) helps the review team verify that those fixtures are part of the construction contract. In the absence of such documentation, a copy of project-specific specifications and details or a project-specific contractor’s submittal with manufacturer’s cut sheets highlighting flush and flow rates for each fixture specified can be provided. Hope helpful!