Log in
Forum
Topic

"Initial fit-out" would be if

General forums
posted by Allison Beer McKenzie on Jul 12, 2010, 8:34 am

"Initial fit-out" would be if you are the first tenant in a new core and shell building, meaning there are no already existing interior walls, finishes, etc. Undergoing alteration would be if you...

Last reply: Allison Beer McKenzie, Sep 20, 2010, 12:57 pm

Data Suite in Data Center: Occupied space?

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Eric JS on Sep 15, 2010, 12:23 pm

For a data center project, will the data suites be considered as occupied space? It is basically a storage room for electronic data. People only come in to do a weekly maintenance in short period...

Last reply: Bill Swanson, Sep 20, 2010, 12:51 pm

Tenant Outfit Proposed Spaces

CS-2009 EAp2: Minimum Energy Performance
posted by Darren White on Sep 19, 2010, 12:01 pm

I am in the process of simulating a 21 floor building, divided into three uses: offices, school, and retail space. None of the floors are planned and the offices have yet to be designed. If I...

Last reply: Marcus Sheffer, Sep 20, 2010, 10:21 am

Process and non-Process energy

CS-2009 EAp2: Minimum Energy Performance
posted by Billy Ng on Jul 29, 2010, 10:55 pm

For Core and shell rating system, do I consider the Process energy in the calculation.

below equation is what i have in mind after read the guidebook.
[(Process + non-Process...

Last reply: Edwin Wealend, Sep 20, 2010, 9:50 am

WEc2 Form

EBOM-2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency
posted by Rachael McClain on May 6, 2010, 3:30 pm

I'm having problems with the WEc2 form, I can't enter any numbers in to the form where it has zeros. Do you have to complete the WEp1 form before that form becomes active?

Last reply: Paul C, Sep 20, 2010, 9:43 am

Uploading Phase II ESA report- where?

Schools-2009 SSp2: Environmental Site Assessment
posted by Renee Shirey on Sep 17, 2010, 4:25 pm

In the online template, when I select the Option for utilizing a Phase II ESA report, it prompts me to upload info from the Phase II report. However, when I go to upload the document, it does...

Last reply: Renee Shirey, Sep 17, 2010, 5:17 pm

Commercial Faucets

CI-2009 WEc1: Water Use Reduction
posted by Zachary Tetreault on Sep 17, 2010, 4:47 pm

The project is one floor in an existing office building. The only bathroom contains one toilet and one faucet. Would the faucet be considered private, similar to a hotel room, or commercial as it...

Last reply: Zachary Tetreault, Sep 17, 2010, 5:00 pm

Utilizing scrap collector instead of a garbage disposal

Schools-2009 WEc4: Process water use reduction
posted by Renee Shirey on Sep 15, 2010, 10:28 am

Has anyone attempted to utilize a scrap collector when attempting WE4? It recirculates the water it uses, reducing supply water usage by 90% over traditional garbage disposals. It would then...

Last reply: Suzanne Painter-Supplee, LEED AP+ID&C, Sep 17, 2010, 3:44 pm

Pricing- Toolkit

EBOM-2009 EAc4: On-Site and Off-Site Renewable Energy
posted by Paul C on Sep 17, 2010, 10:31 am

The pricing document in the toolkit does not provide any pricing numbers. I am just trying to get a feel or what costs are in order to achieve this credit. Thanks.

Last reply: Tristan Roberts, Sep 17, 2010, 1:09 pm

Glass Fiber Reinforced Concrete

NC-2009 MRc5: Regional Materials
posted by Linda Davisson on Sep 17, 2010, 9:38 am

I'm looking for GFRC that is manufactured and extracted from within 500 miles of the DC metro area. I tried using the website mrgreenpoints.com but it only gave one local manufacturer. It's so...