Signed and dated PDF

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Soo young No  on 

We have just received preliminary comments. For credit IEQ p2, it said "Please provide a signed and dated PDF copy of the IEQp2 prerequisite form." We already uploaded owner signed IEQP2-RS1. Do we

3
Default Avatar
Specifier
RYS Architects, Inc.
LEEDuser Basic Member
0 thumbs up
Fri Jan 11, 2013, 5:43 pm

LEED CI Project in Argentina, mainly KITCHEN NON "ES"

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Sonia M. Miranda Palacios  on 

I´m working in a project in Argentina which is up for LEED CI. The project is mainly a new commercial kitchen and dining area for 250 persons.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Jan 11, 2013, 5:09 pm

Proposed Building Boiler Plant / Baseline Building System

NC-2009 EAc1:Optimize Energy Performance
posted by  Blas Beristain  on 

Hello, In the proposed building simulation, some of the spaces are not yet defined and therefore are being simulated as office spaces with System 3 - PSZ-AC.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Jan 11, 2013, 5:09 pm

SSc4.3 & SSc4.4: Rounding to the 5% requirement

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Vinsu Shah  on 

Our project was recently denied both of these credits on not meeting the 5% requirement.

3
Default Avatar
Intern Architect
LLB Architects
LEEDuser Basic Member
0 thumbs up
Fri Jan 11, 2013, 3:38 pm

LED-lights always more efficient? Why not include them?

EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lamps
posted by  Maria Porter  on 

I am pursuing this credit for a CI project as an ID credit. I am wondering, in order to comply with the overall value of 90 pg Hg/(lm*h), I need to include all my LED lamps.

2
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Fri Jan 11, 2013, 11:23 am

IEQc8.1 Day Lighting exempt spaces

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Brady Hartmann  on 

I am trying to determine if a specific room can be excluded from the day lighting calculation.

6
Thu Jan 10, 2013, 9:50 pm

Outdoor Air Contamination

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Norma Lehman  on 

We have a project that has failed an IAQ test by exceeding TVOC levels.

6
Principal
The Beck Group
LEEDuser Basic Member
98 thumbs up
Thu Jan 10, 2013, 8:00 pm

NC 2009 - Green Cleaning ID credit

NC-2009 IDc1:Innovation in Design
posted by  Joseph Ford, AIA  on 

Maybe I haven't looked in the right place but I have read many comments and haven't found clarity on what a proven strategy is for earning a green cleaning ID credit in NC 2009.

6
Sr. Sustainability Consultant
Taitem Engineering
LEEDuser Basic Member
36 thumbs up
Thu Jan 10, 2013, 6:53 pm

infiltration

NC-2009 EAc1:Optimize Energy Performance
posted by  Francesco Passerini  on 

If I model a building where there is mechanical ventilation, how shall I consider the infiltration (i.e.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Jan 10, 2013, 4:09 pm

WE p1 for Commercial Interiors Retail - Process Water Use

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  María Fernanda Aguirre  on 

Hi every one: I am working in a project in Chile, it is a Foodmarket located within a Mall which is also pursuing LEED Certification.

2
Sustainable Project Manager
Skanska Sweden
LEEDuser Basic Member
4 thumbs up
Thu Jan 10, 2013, 11:43 am