Book on LEED for Industrial FacilitiesNC-2009 EAp2: Minimum Energy Performanceposted by Mike Barker on Sep 21, 2010, 2:35 am
Since this EA Credit seems to be the home for discussion about Factories and Industrial Buildings you may be able to tell us if this book is any good ? "Green Facilities: Industrial and... Last reply: Marcus Sheffer, Sep 21, 2010, 8:37 am |
|
LEED-EBOM webinarGeneral forumsposted by Tristan Roberts on May 28, 2010, 7:41 pm
Jordan, have you checked out Jenny Carney's LEED-EBOM webinar recording, which provides some key tips on performance period management? I... Last reply: Tristan Roberts, Sep 21, 2010, 8:07 am |
|
"Initial fit-out" would be ifGeneral forumsposted by Allison Beer McKenzie on Jul 12, 2010, 8:34 am
"Initial fit-out" would be if you are the first tenant in a new core and shell building, meaning there are no already existing interior walls, finishes, etc. Undergoing alteration would be if you... Last reply: Allison Beer McKenzie, Sep 20, 2010, 12:57 pm |
|
Data Suite in Data Center: Occupied space?NC-2009 IEQc8.1: Daylight and views - daylightposted by Eric JS on Sep 15, 2010, 12:23 pm
For a data center project, will the data suites be considered as occupied space? It is basically a storage room for electronic data. People only come in to do a weekly maintenance in short period... Last reply: Bill Swanson, Sep 20, 2010, 12:51 pm |
|
Tenant Outfit Proposed SpacesCS-2009 EAp2: Minimum Energy Performanceposted by Darren White on Sep 19, 2010, 12:01 pm
I am in the process of simulating a 21 floor building, divided into three uses: offices, school, and retail space. None of the floors are planned and the offices have yet to be designed. If I... Last reply: Marcus Sheffer, Sep 20, 2010, 10:21 am |
|
Process and non-Process energyCS-2009 EAp2: Minimum Energy Performanceposted by Billy Ng on Jul 29, 2010, 10:55 pm
For Core and shell rating system, do I consider the Process energy in the calculation. below equation is what i have in mind after read the guidebook. Last reply: Edwin Wealend, Sep 20, 2010, 9:50 am |
|
WEc2 FormEBOM-2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiencyposted by Rachael McClain on May 6, 2010, 3:30 pm
I'm having problems with the WEc2 form, I can't enter any numbers in to the form where it has zeros. Do you have to complete the WEp1 form before that form becomes active? Last reply: Paul C, Sep 20, 2010, 9:43 am |
|
Uploading Phase II ESA report- where?Schools-2009 SSp2: Environmental Site Assessmentposted by Renee Shirey on Sep 17, 2010, 4:25 pm
In the online template, when I select the Option for utilizing a Phase II ESA report, it prompts me to upload info from the Phase II report. However, when I go to upload the document, it does... Last reply: Renee Shirey, Sep 17, 2010, 5:17 pm |
|
Commercial FaucetsCI-2009 WEc1: Water Use Reductionposted by Zachary Tetreault on Sep 17, 2010, 4:47 pm
The project is one floor in an existing office building. The only bathroom contains one toilet and one faucet. Would the faucet be considered private, similar to a hotel room, or commercial as it... Last reply: Zachary Tetreault, Sep 17, 2010, 5:00 pm |
|
Utilizing scrap collector instead of a garbage disposalSchools-2009 WEc4: Process water use reductionposted by Renee Shirey on Sep 15, 2010, 10:28 am
Has anyone attempted to utilize a scrap collector when attempting WE4? It recirculates the water it uses, reducing supply water usage by 90% over traditional garbage disposals. It would then... Last reply: Suzanne Painter-Supplee, LEED AP+ID&C, Sep 17, 2010, 3:44 pm |