Log in
Forum
Topic

Parksmart measures

NC-v4 INc1: Innovation
posted by Norbert Szircsak on Jul 17, 2019, 4:57 am

Dear All,

The innovation strategy 1 under Innovation: Parksmart Measures looks a good fit for our project, and I think generally for many projects.

However from the wording of the...

Last reply: Michaël Briffaz, Feb 5, 2024, 8:37 am

Leak detection based on water meter

Pilot-Credits WEpc153: Water Leak Detection and Monitoring
posted by Michaël Briffaz on Feb 5, 2024, 8:47 am

Hey,

The credit languages is stating to "Install water sensors connected to a local network internet BMS or metering solution on water using subsystems."

Would it be ok to...

Credits Applicable for Product-Services?

EBOM-v4.1 MRc1: Purchasing
posted by Marieke Head on Feb 5, 2024, 8:45 am

My client owns a product-service company that makes (charged) rechargeable batteries available to their clients on a subscription model, whereby my client maintains ownership of the batteries....

beyond the 25 feet boundary and neighboring business

CI-v4 EQp2: Environmental tobacco smoke control
posted by Edgar Arevalo on Dec 6, 2023, 4:10 pm

There is a library project I'm working on which has a policy of no smoking within 100 feet from the entrance.  The thing is it is next to neighboring business that are are within the 100 feet and...

Last reply: Edgar Arevalo, Feb 5, 2024, 11:44 am

Concern regarding entryway systems

EBOM-v4.1 EQc1: Green Cleaning
posted by Wafa Arif on Jan 25, 2024, 4:01 am

Hello,

Under option 2 - Entryway systems, we need to put in place 10 feet elements in the primary direction of travel.

In our hotel project, the double door entrances leave no space...

Last reply: Stephen Ashkin, Feb 5, 2024, 1:33 pm

Purchasing- Lamps with UV-C

NC-v4 INc1: Innovation
posted by on Aug 1, 2023, 1:50 pm

Does anyone know if the Purchasing - Lamps innovation credit requires reporting of UV-C lights in air handlers (for coil irradiation and virus mitigation)? If so, what is the equivalent pg HG...

Last reply: Edgar Arevalo, Feb 5, 2024, 3:11 pm

FEES FOR BASEMENT AREA

LEED v4.1 Discussion Forum
posted by Subrota Roy on Feb 6, 2024, 4:21 am

 Is it necessary to calculate the basement area when we calculate the...

Can a non-revenue listed meter (or PTs and CTs integrated with the BAS) be utilized for credit compliance?

Healthcare-v4.1 EAc3: Advanced Energy Metering
posted by Keith Robertson on Feb 1, 2024, 1:34 pm

For low-level metering of loads, greater than 10% can a non-revenue listed meter (or PTs and CTs integrated with the BAS) be utilized to collect data in accordance with obtaining the advance...

Last reply: Marcus Sheffer, Feb 6, 2024, 5:05 pm

EAp2-Energy Modeling_ Natural Ventilation/cooling Equivalent in Baseline models?

Mid-Rise-v4 EAp1: Minimum Energy Performance
posted by Claudio Leon on Oct 10, 2019, 4:02 am

Dear all,

As many of you may know, up until now ROS such as office rooms (Office), Bedrooms(Residental), etc. are not required to be mechanically cooled and sometimes not even ventilated...

Last reply: Azra, Feb 7, 2024, 4:05 am

Thermal compliance of Revolving doors

NC-v4 EAp2: Minimum Energy Performance
posted by Alokmay Behera on Feb 2, 2024, 3:13 am

I am working on a LEED project with revolving doors at the building entrances. The project has a proposed glazing specification. The Client wants clear glass in the revolving doors which however...

Last reply: Alokmay Behera, Feb 7, 2024, 6:42 am