Forum quick links
IEQ Pr1 - work code in France in place of ASHRAE
NC-2009 IEQp1:Minimum IAQ Performanceposted by Nicolas MOLLE on
Can you confirm me that it is possible, in France, to use the work code to determine the air rate in place of the ASHRAE 62.1-2007 in the places where this local code is more stringent ?
Increasing Space Ventilation Efficiency by Increasing Vpz
NC-2009 IEQp1:Minimum IAQ Performanceposted by Ed Floyd on
Question seems to simple to me but I can not find a definate answer. Is it acceptable / Common to increase the primary air flow to a critical zone to increase the over system ventilation efficienc
The LEED HC vs LEED NC question ....again
posted by Kathy Wislocky on
Our healthcare project will be a licensed facility by the state's deparment of public health. However, it is a community health center and not part of a hospital campus.
Must Performance Period be complete before registering for pc67?
Pilot-Credits EApc67:Energy Jumpstartposted by Reid Middlebrooks on
Is pilot credit 67 only intended for projects that have already completed the EE improvements and can prove a 20% reduction?
Erosion Control
NC-2009 MRc2:Construction Waste Managementposted by Josh Mauldin on
The contractor on my project recently provided me with documentation that ~14 tons of concrete and brick that were removed from the site during demolition were used for erosion control.
Project development stage for submisison
posted by Marcio Alberto Casado Pereira on
Dear all, Our client is insisting to submit the preliminary project for LEED review.
Changing a previously registered project's rating sys.?
posted by Amar Colakhodzic on
I am working on a Commercial Building Project that was registered over two years ago as a LEED CS (v2.0). Following registration the project went on hold and became recently active.
ENERGY STAR sharing data in NC-2009
NC-2009 PIf1:Minimum Program Requirementsposted by Ryan L on
For our project we have selected Option 1: Energy and Water Data Release Form.
shopping mall
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Adam Targowski on
I'm working on a shopping mall project.
Ceramic tile coating applied off-site
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Marcio Alberto Casado Pereira on
Dear all, I'd just like to clarify: would ceramic be considered a mineral based floor and therefore be exempt from any tests?