Log in
Forum
Topic

2 years metering data

EBOM-2009 EAp1: Energy efficiency best management practices - planning, documentation and opportunity assessment
posted by Rachael McClain on May 26, 2010, 1:46 pm

For the Level I Energy audit, it requires analysis of two or more years of utility consumption and cost. The building we are trying to certify shares an electric meter with other buildings on...

Last reply: Igor Barer, Jun 4, 2010, 8:05 pm

Kitchens and regular occupancy (multi-familiy housing)

NC-2009 IEQc8.2: Daylight and views - views
posted by Walter Currin on May 27, 2010, 9:47 am

I am working in a project team designing apartments geared for college students. We are planning on considering our kitchens as non-regularly occupied spaces. The reference guide does not say...

Last reply: Jean Marais, Apr 27, 2012, 8:51 am

Eligibility of directly used groundwater

NC-2009 EAc2: On-Site Renewable Energy
posted by Jens Apel on Jun 3, 2010, 7:45 am

I am working on a European project where groundwater is directly used for space cooling without any vapor compression cycle. The system is approved by he local authorities.
Does anybody...

Last reply: Jens Apel, Nov 3, 2011, 5:28 am

Achieving Brownfield Redevelopment credit without Phase II ESA

NC-2009 SSc3: Brownfield Redevelopment
posted by Waylon Lo on Jun 11, 2010, 3:06 pm

We are working on a major renovation of an existing office building built in 1951. A Phase I ESA study and sampling of suspectg asbestos-containing materials, lead-contatining paint, mold and...

Last reply: Larry Sims, Jun 28, 2010, 3:26 am

LEED for Schools Credit 4.6- question about roofing insulation

Schools-2009 IEQc4.6: Low-Emitting Materials—Ceiling and Wall Systems
posted by Peggy White on Jun 19, 2010, 7:01 pm

Hello - I hope this is the correct place to post this question:

Does LEED for Schools IEQ Credit 4.6, Low-Emitting Materials - Ceiling
and Wall Systems, include ROOFING insulation?...

Last reply: Tristan Roberts, Nov 4, 2013, 9:32 pm

Lighting Controls in Open Library Stack and Reading Areas

NC-2009 IEQc6.1: Controllability of systems - lighting
posted by Tate Walker on Jun 23, 2010, 3:54 pm

underfloor air and spacing registers accordingly and then using task lighting. Stacks are exempt. Unfortunately I cannot share the documentation, but would happy to provide continued input in this forum...

Last reply: Abena Darden, Jul 13, 2010, 3:48 pm

Phased building construction and LEED--any references or advice

General forums
posted by Walt Zapor on Jun 24, 2010, 4:52 pm

A school project - a renovation - is planned to seek LEED certification and consists of:
1- a section of an existing building where ownership is structured like a condominium
2- due...

Last reply: David Posada, Oct 8, 2010, 12:55 pm

Energy modeling for unconditioned human occupied spaces

NC-2009 EAp2: Minimum Energy Performance
posted by Yusuf Turab on Jul 15, 2010, 4:02 pm

I recently attended a course on energy modeling using eQuest. I was puzzled by the response of the instructor when asked how can one model an office building that is completely unconditioned....

Last reply: Muhammad Farooq Saeed, Mar 17, 2024, 9:26 pm

Rated Power

CI-2009 EAc1.4: Optimize energy performance - equipment and appliances
posted by kelvin duen on Jul 20, 2010, 3:13 pm

I'm having a little confusion as to what "...

Last reply: Paul Conrad, Jul 20, 2010, 3:44 pm

Pressure of water supply for faucets/showerheads

EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by Yong Lee Low on Jul 27, 2010, 4:10 am

Does the flow rate to be specified in the online template for all the kitchen/public and private lavatory faucets/showerheads to be at a specific PSI? For. eg. the showerhead used in the building...

Last reply: Jenny Carney, Aug 18, 2010, 11:45 am