Forum quick links
vegetable oil recycling
NC-2009 IDc1:Innovation in Designposted by Emily Hagy on
My office is working on a large Multi-building Mixed used NC LEED 2009 project in a urban area. The first floor will have retail space, potentially a few restaurants, and a small grocery store.
Password and Zone Floor Area questions
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Gabriela Almquist on
Hi, I'm trying to add a regularly occupied space (row) in the excel spreadsheet and it gives me an error message saying I do not have permission.
Credit Achievement Rate of 0%?
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Ron Dean on
Hello, At the right of the screen says that 0 of 210 certified projects in C&S earned this credit. I'd like to know why?
LEED CI for Data center project
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Lavanya Veerappa on
Hi, A data centre project that i am working for is applying for LEED CI. We are planning to work on option 1 - prescriptive approach to meet enhanced energy performance.
Standard PV commissioning?
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Jared Silliker on
Does anybody have a standard checklist or list of data points for commissioning a PV system? Related, is it OK for a CxA to ask the PV sub to gather data for Cx purposes vs.
updated spreadsheet
EBOM-2009 MRc5:Sustainable Purchasing—Foodposted by Tristan Roberts on
LEEDuser has updated the Sustainable Food Purchases Tracking Sheet in our Doc Toolkit. (see above)
Underground parking compliance with the c7.1 requirements
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by BABAR MEHMOOD on
We have a project in Riyadh, and 92 % parking is under ground ( 2 basements for parking) so we are complying the 50% parking requirements which donot require SRI Roof.
Option 2: ASHRAE Advanced Energy Design Guide
NC-2009 EAc1:Optimize Energy Performanceposted by Heather Holdridge on
We are following the option 2 ASHRAE AEDG presciptive path for a project. One of the AEDG requirements for HVAC is for a heat pump >135 kBtuh to be at minimum 10.1 EER or above.
VRF systems and outside air modeling
NC-2009 EAc1:Optimize Energy Performanceposted by Robert Sutton on
Has anyone done a VRF system serving various zones using say heat pump VRF units and then providing outside ventilation air from a separate dedicated unit serving the same various zones?
COP CHILLER BASELINE
NC-2009 EAp2:Minimum Energy Performanceposted by VICTOR MORENO on
Hi, I have to recalculate the chiller COP of Baseline Building, to consider the power of the fans? Or just put the COP marked by Standard 90.1 and attributed the fan power calculated by the Stan