Forum quick links
Natural Ventilation: Which spaces are to be considered?
NC-2009 IEQp1:Minimum IAQ Performanceposted by Marco Abdallah on
1. Are only regularly occupied spaces to be considered or all generally spaces (including stairs, corridors, storage and technical rooms)? 2.
Thermal Comfort (IEQc 7.1) for Industrial Applications
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Ismaiel Salama on
We are targeting this credit for a project with more than 70% of the buildings are utilised for industrial, processing, storage and manufacturing activities.
LEED v2.2 design credit re-evaluation during construction submit
posted by Susan Walter on
We are wrapping up a LEED v2.2. project and looking to submit for our construction review. The design credits have been through the process and the design review has been accepted.
Understanding how hazardous materials effect calculations
NC-2009 MRc2:Construction Waste Managementposted by Renee Shirey on
Scenario: select asbestos-containing material (ACM) to be left in exist. bldg (and is allowed to be) and will be handled during demolition.
No tenants at this stage
posted by R Jones on
What happens if the developer doesn't have any tenants onboard at the time of certification? Can a draft lease agreement suffice?
Form Template Compliance
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Erin Cowan on
We are working with a University that collects everything but Glass however that is detailed out in the special circumstances.
Option 3, share whole bldg energy and water data
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Courtney Royal on
Hello! This may be a stupid question, but I am reviewing the requirements for EAc5.1 and came across Option 3.
Total for Division 12-Reused Furniture Amount PLUS Cost of New??
CI-2009 MRc3.2:Materials Reuse—Furniture and Furnishingsposted by Michelle Bracewell-Musson on
The higher the amount for reused furniture, the higher the number for Total Division 12, therefore more difficult to obtain the 30%. Ex.
LEED ID for Electric Vehicle Charging Stations
CI-2009 IDc1:Innovation in Designposted by Jennifer Berthelot-Jelovic on
Is it likely that by providing 5% of the parking with electric vehicle charging stations we will be able to achieve an ID point? If so, how do I got about documenting it?
Lighting control for Barracks sleeping bays
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Jeff Koehler on
I have a large open sleeping bay for about 30 people. I have 2 rows of lights. Is having each row switched separately good enough for the credit?