Option 2 - The Performance Rating Method

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Emma Eliasson  on 

Hi, LEED Reference Guide For Green Interior Design And Construction says in chapter EAc1.3 (# 6.

5
Default Avatar
Senior ESD Consultant
LEEDuser Basic Member
62 thumbs up
Tue Mar 19, 2013, 5:56 pm

Liquid Lava

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Allen Cornett  on 

I have a client wanting to install modular panels consisting of liquid sealed within the tiles in a small area of their building.

3
Tue Mar 19, 2013, 5:39 pm

particle board

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Jaida Anderson-Lozano  on 

Would particle board be considered for this credit requirements? We have a situation where we are using it on the floor but I wouldn't necessarily see this as being held to these requirements.

3
Tue Mar 19, 2013, 3:37 pm

EA P2 and EA C1 requirements clarifications

NC-2009 EAc1:Optimize Energy Performance
posted by  BABAR MEHMOOD  on 

in EA P2, it's written to comply with mandatory provisions which are for example 5.4 which is related to Building envelope under Option 1.

6
Tue Mar 19, 2013, 3:03 pm

Green Wall

CS-2009 EAp2:Minimum Energy Performance
posted by  Yoyo Shek  on 

Does anyone have idea if we could model the benefit of using green wall (Vegetated)?

8
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Mar 19, 2013, 4:06 am

Exception For Baseline HVAC System

CS-2009 EAp2:Minimum Energy Performance
posted by  Yoyo Shek  on 

I am running a high-rise commercial development for LEED-CS. According to Table G3.1.1B, the baseline system shall be chilled water.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Mar 19, 2013, 2:51 am

Question regarding the OPR and BOD

CI-2009 EAc2:Enhanced Commissioning
posted by  Robert Calloway  on 

We have a client that has the Owners Project Requirements (OPR) but no Basis of Design (BOD). Is it acceptable for the OPR to be used in place of the BOD?

2
Mon Mar 18, 2013, 7:48 pm

Site boundary for a project mixing Leed & non Leed new buildings

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  serge sidoroff  on 

Is it possible to submit to the Leed certification only one of two adjacent new buildings, an office building and an industrial plant ?

4
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Mar 18, 2013, 6:21 pm

LEED AP v4

General forums
posted by  Tristan Roberts  on 

Robert, no deadline has been announced. As you may have heard, LEED v4 isn't being launched until 2013, assuming a successful member ballot.

2
Default Avatar
Sustainability Consultancy Services
Cushman & Wakefield
LEEDuser Basic Member
11 thumbs up
Mon Mar 18, 2013, 6:03 pm