Topic | Recent |
---|---|
IEQp1- A3 Table Mechanical Ventilation 100%OANC-2009 IEQp1: Minimum indoor air quality performanceposted by Todor Boyadzhiev on Aug 4, 2012, 7:56 am
Hello All, I have noticed the following while filling in this table: There is NO fieled where one can fill in the Project Design Outdoor Airflow for EACH SEPARATE ROOM. At the... Last reply: susan eguia, Nov 8, 2012, 8:01 pm |
|
CO2 sensors applicable to non regularly occupied space?NC-2009 IEQc1: Outdoor Air Delivery Monitoringposted by Helena Larsson on Aug 7, 2012, 5:41 am
I have a question in regards to non-regularly occupied lunch/breakrooms. Default occupancy... Last reply: John McFarland, Oct 2, 2012, 8:09 pm |
|
I have restrooms in theNC-2009 WEp1: Water Use Reductionposted by Marcio Alberto Casado Pereira on Sep 11, 2012, 10:54 am
I have restrooms in the building I am certifying, an also restrooms with showers in a 40sqm building inside my project boundary. Logically, I am not certifying the last one, but I will use it for... Last reply: Carlie Bullock-Jones, Apr 2, 2013, 12:41 pm |
|
Non-Predominant SpacesNC-2009 EAp2: Minimum Energy Performanceposted by Wes Lawson on Sep 28, 2012, 4:29 pm
We are modeling a building that is separated into three different spaces. These spaces have differing functions, schedules and systems. There is an office, manufacturing area, and warehouse... Last reply: Marcus Sheffer, Oct 4, 2012, 9:43 am |
|
District cooling PV arrayNC-2009 EAc2: On-Site Renewable Energyposted by Katherine Ann Resurreccion on Oct 20, 2012, 11:31 am
If the project is district cooled with option 1 where the cooling energy consumption is determined by adding chilled water meter in the energy model for EAc1, in calculating the capacity of the... Last reply: Marcus Sheffer, Jan 8, 2014, 11:44 am |
|
Updating the LEEDOnline form after being acceptedNC-2009 EAp2: Minimum Energy Performanceposted by Maya Karkour on Oct 31, 2012, 11:04 am
Dear All, If the USGBC awards 4 points under EA Credit 1, but then the design team decides to add significant lighting to the project which will increase the Proposed consumption (and... Last reply: Marcus Sheffer, Nov 2, 2012, 9:33 am |
|
Supplementary Cementitious MaterialsNC-2009 MRc4: Recycled Contentposted by Marcio Alberto Casado Pereira on Nov 26, 2012, 12:58 pm
RefGuide says in page 373 "In the case of supplementary cementitious materials (SCMs) used in concrete recycled from other operations, the... Last reply: Nadav Malin, Jan 8, 2013, 4:04 pm |
|
FTE for a BarracksNC-2009 PIf3: Occupant and Usage Dataposted by Christopher Sawyer on Nov 29, 2012, 4:31 pm
My project is a military barracks for 650 cadets on a campus. It is "Lodging: Dormitory" and there are no offices or securtiy personal etc. When filling out this template for "simple... Last reply: Christopher Sawyer, Dec 12, 2012, 1:11 pm |
|
Which type of water needs to be filtered?NC-2009 SSc6.2: Stormwater design - quality controlposted by Marcio Alberto Casado Pereira on Jan 23, 2013, 11:01 am
Dear all, Please confirm this assumption - our interpretation of this credit is that it only applies to runoff, not to roof captured water. Is this correct? I'm asking because the client... Last reply: Michael DeVuono, Jan 29, 2013, 7:47 am |
|
Two-year contractsNC-2009 EAc6: Green Powerposted by Kath Williams on Feb 2, 2013, 12:08 pm
Seems like this question must have been asked before but I can't find the answer. Can Green Power credit be earned if the owner (a government entity) is restricted from contracting more than one... Last reply: Marcus Sheffer, May 13, 2014, 12:07 pm |