Log in
Forum
Topic

IEQp1- A3 Table Mechanical Ventilation 100%OA

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Todor Boyadzhiev on Aug 4, 2012, 7:56 am

Hello All,

I have noticed the following while filling in this table:

There is NO fieled where one can fill in the Project Design Outdoor Airflow for EACH SEPARATE ROOM. At the...

Last reply: susan eguia, Nov 8, 2012, 8:01 pm

CO2 sensors applicable to non regularly occupied space?

NC-2009 IEQc1: Outdoor Air Delivery Monitoring
posted by Helena Larsson on Aug 7, 2012, 5:41 am

I have a question in regards to non-regularly occupied lunch/breakrooms. Default occupancy...

Last reply: John McFarland, Oct 2, 2012, 8:09 pm

I have restrooms in the

NC-2009 WEp1: Water Use Reduction
posted by Marcio Alberto Casado Pereira on Sep 11, 2012, 10:54 am

I have restrooms in the building I am certifying, an also restrooms with showers in a 40sqm building inside my project boundary. Logically, I am not certifying the last one, but I will use it for...

Last reply: Carlie Bullock-Jones, Apr 2, 2013, 12:41 pm

Non-Predominant Spaces

NC-2009 EAp2: Minimum Energy Performance
posted by Wes Lawson on Sep 28, 2012, 4:29 pm

We are modeling a building that is separated into three different spaces. These spaces have differing functions, schedules and systems. There is an office, manufacturing area, and warehouse...

Last reply: Marcus Sheffer, Oct 4, 2012, 9:43 am

District cooling PV array

NC-2009 EAc2: On-Site Renewable Energy
posted by Katherine Ann Resurreccion on Oct 20, 2012, 11:31 am

If the project is district cooled with option 1 where the cooling energy consumption is determined by adding chilled water meter in the energy model for EAc1, in calculating the capacity of the...

Last reply: Marcus Sheffer, Jan 8, 2014, 11:44 am

Updating the LEEDOnline form after being accepted

NC-2009 EAp2: Minimum Energy Performance
posted by Maya Karkour on Oct 31, 2012, 11:04 am

Dear All,

If the USGBC awards 4 points under EA Credit 1, but then the design team decides to add significant lighting to the project which will increase the Proposed consumption (and...

Last reply: Marcus Sheffer, Nov 2, 2012, 9:33 am

Supplementary Cementitious Materials

NC-2009 MRc4: Recycled Content
posted by Marcio Alberto Casado Pereira on Nov 26, 2012, 12:58 pm

RefGuide says in page 373 "In the case of supplementary cementitious materials (SCMs) used in concrete recycled from other operations, the...

Last reply: Nadav Malin, Jan 8, 2013, 4:04 pm

FTE for a Barracks

NC-2009 PIf3: Occupant and Usage Data
posted by Christopher Sawyer on Nov 29, 2012, 4:31 pm

My project is a military barracks for 650 cadets on a campus. It is "Lodging: Dormitory" and there are no offices or securtiy personal etc.

When filling out this template for "simple...

Last reply: Christopher Sawyer, Dec 12, 2012, 1:11 pm

Which type of water needs to be filtered?

NC-2009 SSc6.2: Stormwater design - quality control
posted by Marcio Alberto Casado Pereira on Jan 23, 2013, 11:01 am

Dear all,

Please confirm this assumption - our interpretation of this credit is that it only applies to runoff, not to roof captured water. Is this correct? I'm asking because the client...

Last reply: Michael DeVuono, Jan 29, 2013, 7:47 am

Two-year contracts

NC-2009 EAc6: Green Power
posted by Kath Williams on Feb 2, 2013, 12:08 pm

Seems like this question must have been asked before but I can't find the answer. Can Green Power credit be earned if the owner (a government entity) is restricted from contracting more than one...

Last reply: Marcus Sheffer, May 13, 2014, 12:07 pm