Forum quick links
LEED NC-2009 IEQc8.1: How to Average Multiple Tvis Values
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Jay Wierzbicki on
I am trying to calculate the resultant Tvis value of glazing when the overall value is not provided.
Documentation of Natural Ventilation in PDF Template
NC-2009 EAp2:Minimum Energy Performanceposted by Marco Abdallah on
We have modelled our building which is equipped with hydronic heating and natural ventilation (no cooling) according to App D of the Advanced Energy Modelling Guide v2.0.
Small study rooms- 2-3 rooms per thermostat
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Katie Schulze on
I am working on a library that has tons of spaces that can meet the needs of individuals or multiple occupants. In the case of the small study rooms, I am qualifying them as multi-occupant rooms.
Energy modeling Gross Surface / Net surface.
CS-2009 EAp2:Minimum Energy Performanceposted by Alessio Zampaglione on
Section 1.2 Space summary in prerequisite EAp2 asks for GrossSquareFootage (GSF) of regularly and unconditioned zones.
Filling out EAp2 form
CS-2009 EAp2:Minimum Energy Performanceposted by Ron Dean on
Hi everyone, I have the three following questions: 1. In the EAp2 form, I have to write the HDD and CDD for Lima, Peru.
Pilot Credit #44 Ergonomics Strategy - LEED User registration
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Cindy Davis on
I received a comment back from our LEED preliminary design review that the 'reviewer' is unclear if the project team representative (me) has registered with LEEDuser, since a completed survey has n
Sub-metering in Option D
NC-2009 EAc5:Measurement and Verificationposted by Alicia Villanueva on
Marcus Sheffer posted some months ago in this credit: "You will need to calibrate the model by energy end use on a monthly (and annual) basis. [...] Yes you would need to separate out the electric
MPR#6 - Option 1: Sharing data via Energy Star Portfolio Manager
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Ron Dean on
One of the projects I'm working on in Peru, is persuing the option 1 of MPR#6 (through Energy Star Portfolio Manager:ESPM) so we can get one EP point in EAc5.1. So, my questions are: 1.
No new parking, can we still achieve Option 1?
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Eamon Geary on
The project I am working on is a new facility on a pre-existing campus. There are is no new parking added and all new employees are expected to find parking spots on their own.