Log in
Forum
Topic

EAc2.1 and EAc2.2 performance periods and compliance

EBOM-2009 EAc2.2: Existing building commissioning - implementation
posted by Lynette Liboy on Sep 28, 2010, 3:29 pm

Hi,

What if a building has already implemented several energy conservation measures (low and High cost) in the last year but no...

Last reply: Lynette Liboy, Sep 29, 2010, 8:36 am

Recycled water from Local Government

NC-2009 WEc2: Innovative Wastewater Technologies
posted by Eric JS on Sep 14, 2010, 10:42 pm

Hi all,

If we use non-potable recycled water supplied by local government, can it be eligible for the point?

The recycled water is still not available for the whole country (...

Last reply: Tristan Roberts, Sep 28, 2010, 11:37 pm

50 % Pervious Pavement or Each Paver need to be 50% Pervious?

CI-2009 SSc1: Site Selection
posted by Simon Sue on Sep 13, 2010, 3:57 am

Hi,

when i look at SSC1 path 4, i keep asking the above question to myself,

therefore, which one is the correct defination for "2. indentify all hardscape surfaces that are open...

Last reply: Tristan Roberts, Sep 28, 2010, 11:26 pm

performance period

EBOM-2009 SSc2: Building Exterior and Hardscape Management Plan
posted by Pablo Fortunato Suarez on Sep 28, 2010, 3:33 pm

There were exterior and hardscape management procedures in practice in the past which are LEED compliant. A...

Last reply: Tristan Roberts, Sep 28, 2010, 10:21 pm

Default value for open grid paver.

CI-2009 SSc1: Site Selection
posted by Simon Sue on Sep 13, 2010, 3:59 am

Hi all,
i facing some difficulty to look for runoff coefficient value for open grid paver made locally here in Taiwan. Does LEED give any default value for open grid paver?
any advice...

Last reply: Tristan Roberts, Sep 28, 2010, 10:16 pm

Value input for "Minimum required outside air flow,CFM"

EBOM-2009 IEQp1: Minimum indoor air quality performance
posted by Yong Lee Low on Jul 23, 2010, 3:58 am

In this pre-requisite we are following 'Option A' and filling in details in the 2007UM_62MZ Calculator.

Further,filling in the online template column 3 in Table 1.1 requires "Minimum...

Last reply: Jenny Carney, Sep 28, 2010, 10:12 pm

EP Credit

EBOM-2009 MRc8: Solid waste management - durable goods
posted by Walker Burttschell on Sep 27, 2010, 2:04 pm

According to the 2009 reference guide an exemplary performance point is not available for MRc8 (pg. 314). However, the actual credit template allows you to mark it for the extra point. And...

Last reply: Tristan Roberts, Sep 28, 2010, 10:05 pm

IESNA RP-33

CS-2009 SSc8: Light Pollution Reduction
posted by Julie Hendricks on Sep 28, 2010, 4:37 pm

On first submittal of this credit, we got the comment that our project was actually in an LZ-2 zone instead of an LZ-3 zone. We've always decided which zone our project is in based on the...

Table Flush Fixture Data and Flow Fixture Data

NC-2009 WEp1: Water Use Reduction
posted by Rob Hink on Aug 30, 2010, 2:36 pm

Under the Fixture Group Column; What goes is supposed to be typed in the 'Select' Column?

Last reply: Erica Downs, Sep 28, 2010, 2:30 pm

Transfer data to LEED online?

Schools-2009 MRc1.1: Building reuse - maintain existing walls, floors and roof
posted by Nicole Cavanaugh on Sep 28, 2010, 10:28 am

How do we go about transferring the data from the provided LEED template to the online form? (Assuming there is an easier way than re-entering all the info? )

Thanks for your help!

Last reply: Tristan Roberts, Sep 28, 2010, 10:56 am