Forum quick links
Building Envelope Commissioning LEED required test methodology
NC-2009 EAc3:Enhanced Commissioningposted by Pablo Fortunato Suarez on
Our project has included Building Envelope Commissioning as part of the scope of Enhanced Commissioning plan.
Form Questions
Healthcare-v2009 IEQc2:Acoustic environmentposted by Catherine Blakemore on
Tables IEQc2-1 and IEQc2-2: - Does each room/space get listed? - How are storage and mechanical rooms to categorized? Table IEQc2-1: When Space Type "Public Space" is selected, the automatic
LEV discounted parking
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by BABAR MEHMOOD on
I am working on Healthcare outpatient clinic in Riyadh.
Deleted Uploads Reviewed
posted by Jane Long on
We have received our construction preliminary review back and we notice that the reviewer in his comments for couple of the credits queried is referring to uploads that we have not provided in our
Dorm - shared FCU and Controls
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Patrick MacPherson on
We have a University Dorm project and it is understood that we would be required to have at minimum 1 control for each dorm room. The mechanical system provided has 1 FCU for every 2 dorm rooms.
Stormwater Inspection Checklist - Clarity/Support Needed
EBOM-2009 SSc6:Stormwater Quantity Controlposted by Michelle Bracewell-Musson on
I am wondering if we can leave the sections below blank on the Stormwater Inspection Checklist due to only having large open turf/landscape areas and no retention ponds (we have ponds, but these ar
Details on letter stating recycling content
CS-2009 MRc4:Recycled Contentposted by Michael E. Edmonds-Bauer on
I would like to know if someone has some experience with the level of detail the letters from manufactures need to be made.
Manufacturer bulb information availability is lacking!
EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lampsposted by Laura Charlier on
Hello all. I have spent most of this week trying to complete research from the review comments. I have some questions, but also feedback for all of you. 1.
Change of tenant
NC-2009 PIf2:Project Summary Detailsposted by Antonio Rodriguez on
I am working in a CS project, which was registered under the future tenant's name, and has already achieved pre-certification.
LOv3 incompatibilities preventng access
posted by Steve Khouw on
LOv3 not yet compatible with certain releases of Adobe Acrobat/Reader and IE10, that we know now USGBC IT trying to fix it. Has anybody heard as to when they reckon they can sort it out?