Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Core & Shell: Electricity Use

CS-2009 EAc6:Green Power
posted by  Marco Abdallah  on 

The electricity use determined by the whole buildinig simulation simulation in EAp2 is including also plug load on the tenant spaces (not part of the core&shell scope of work). Eac6 is automati

3
Default Avatar
LEEDuser Premium Member
1 thumbs up
Thu May 23, 2013, 5:23 pm
6
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu May 23, 2013, 3:32 pm

WC's

CS-2009 WEp1:Water Use Reduction
posted by  CRolim Engenharia  on 

Hi all! I am working on a residential building with a large leisure area. One of this leisure area is the assembly room that has two WC's: men's room and ladies room.

2
Default Avatar
Project Manager
EAN Technology
LEEDuser Basic Member
17 thumbs up
Thu May 23, 2013, 12:38 pm

HVAC to meet COP, outside US

CI-2009 EAp2:Minimum Energy Performance
posted by  SW LEE  on 

Hi, We have a project outside US. Our AC unit able to meet stated EER in ASHRAE 90.1, but is not ARI tested.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu May 23, 2013, 6:42 am

Tenant lease clauses

CS-2009 WEp1:Water Use Reduction
posted by  Mike D  on 

If our project has a water reduction of 30% but is not installing any urinals or kitchen taps, what clauses should be included for the tenant?

2
Default Avatar
LEEDuser Basic Member
45 thumbs up
Thu May 23, 2013, 1:44 am

Same firm as sub-contractor and CxA

NC-2009 EAc3:Enhanced Commissioning
posted by  Sally Marr  on 

I am working on a Design-Build project of over 50,000 sf for which the contractor has hired a certain firm to do the testing and balancing.

2
Default Avatar
Commissioning Engineer
LEEDuser Basic Member
15 thumbs up
Wed May 22, 2013, 9:46 pm

Streamlined Path

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  Heather Holdridge  on 

I checked off this box in my form on LEED Online and the upload buttons for roof plans and SRI cut sheets have not disappeared. Are the streamlined paths not a pursuable option anymore?

3
Sustainability Director
Lake|Flato Architects
LEEDuser Basic Member
78 thumbs up
Wed May 22, 2013, 9:35 pm

Exterior Envelope Commissioning

NC-2009 IDc1:Innovation in Design
posted by  Eric Thompson  on 

Hi The Innovation Catalog shows two precedents of Exterior Envelope Commissioning, one approved and one denied.

8
CEO
Green Commons, LLC
LEEDuser Expert
586 thumbs up
Wed May 22, 2013, 8:56 pm

No Smoking Signs

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Bonnie Saxon  on 

We are designing a "High-End" Office Building and Owner does not want the typical white/red no smoking signage at the entrances of the building.

2
Default Avatar
EcoConsulting
LEEDuser Basic Member
549 thumbs up
Wed May 22, 2013, 3:02 pm

VAV FAN POWER BOX MODELING

NC-2009 EAp2:Minimum Energy Performance
posted by  HOUCINE TLEMSANI  on 

I am working on a project where the base line hvac system is type 6 VAV with fan power boxes.

5
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed May 22, 2013, 2:58 pm