CS-2009 EAc6:Green Powerposted by Marco Abdallah on
The electricity use determined by the whole buildinig simulation simulation in EAp2 is including also plug load on the tenant spaces (not part of the core&shell scope of work). Eac6 is automati
CalGreen and LEED Requirements for SSc4.3
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Sonrisa Lucero on
I am sure someone has pursued SSc4.3 in CalGreen territory.
WC's
CS-2009 WEp1:Water Use Reductionposted by CRolim Engenharia on
Hi all! I am working on a residential building with a large leisure area. One of this leisure area is the assembly room that has two WC's: men's room and ladies room.
HVAC to meet COP, outside US
CI-2009 EAp2:Minimum Energy Performanceposted by SW LEE on
Hi, We have a project outside US. Our AC unit able to meet stated EER in ASHRAE 90.1, but is not ARI tested.
Tenant lease clauses
CS-2009 WEp1:Water Use Reductionposted by Mike D on
If our project has a water reduction of 30% but is not installing any urinals or kitchen taps, what clauses should be included for the tenant?
Same firm as sub-contractor and CxA
NC-2009 EAc3:Enhanced Commissioningposted by Sally Marr on
I am working on a Design-Build project of over 50,000 sf for which the contractor has hired a certain firm to do the testing and balancing.
Streamlined Path
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Heather Holdridge on
I checked off this box in my form on LEED Online and the upload buttons for roof plans and SRI cut sheets have not disappeared. Are the streamlined paths not a pursuable option anymore?
Exterior Envelope Commissioning
NC-2009 IDc1:Innovation in Designposted by Eric Thompson on
Hi The Innovation Catalog shows two precedents of Exterior Envelope Commissioning, one approved and one denied.
No Smoking Signs
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Bonnie Saxon on
We are designing a "High-End" Office Building and Owner does not want the typical white/red no smoking signage at the entrances of the building.
VAV FAN POWER BOX MODELING
NC-2009 EAp2:Minimum Energy Performanceposted by HOUCINE TLEMSANI on
I am working on a project where the base line hvac system is type 6 VAV with fan power boxes.