Intermittent ventilationNC-v4 EQp1: Minimum indoor air quality performanceposted by Dustin Smith on Jan 22, 2019, 11:16 am
Has anyone successfully used scheduled intermittent ventilation for a constant-volume exhausted space to avoid overventilation, and to minimize energy usage, in a warehouse or similar space? |
|
Schools- 2009 IEQp3- STC requirement between Computer Lab and Elevator ShaftSchools-2009 IEQp3: Minimum Acoustical Performanceposted by Todd Bundren on Jan 22, 2019, 2:47 pm
Does anyone know what the... |
|
Flush out using building emergency exhaust ventilation systemRetail-CI-v4 EQc4: Indoor air quality assessmentposted by Mahesh Shankar on Jan 23, 2019, 1:29 am
The project is a retail store which is not flushing out the space using outdoor air. The exhaust ventilation system of the building is used to exhaust the air from the space at required... |
|
Materials inside the buildingNC-v4 EQc2: Low-emitting materialsposted by Konstantina Kalliakoudi on Jan 23, 2019, 3:18 am
Hello to all, In my understanding this credit "Low emitting materials" concerns materials inside the building, and not outside. Is this right? Thanks |
|
Leed v4 BD+C examplesLEED Rating System Selectionposted by Konstantina Kalliakoudi on Jan 23, 2019, 4:35 am
Hello to all, Is there a link where I could find real examples of buildings as registered for LEED New Construction v4 BD+C? Or do you know maybe another source where I could find... |
|
Is the M1 certified floorcovering sufficient to show compliance under the credit IEQ credit 4.3 flooring systemsCS-2009 IEQc4.3: Low-emitting materials - flooring systemsposted by Gulafshan Bano on Jan 23, 2019, 1:12 pm
I am in process of evaluating electrical room “floor covering” product (vinyle cover). As informed by Manufacturer, product not certified under FloorScore but holds M1 certified. M1 is a... |
|
Envelope Commissioning as an Innovation credit in CI-v4CI-v4 INc1: Innovationposted by Heather DeGrella on Jan 23, 2019, 2:59 pm
Hi All, I was wondering if anyone has had success "borrowing" the Enhanced Commissioning "Option 2: Envelope Commissioning" from BD+C and pursuing it as an innovation credit under... |
|
LEED v4 Low Emitting Materials- Consistancy with testing methodsCS-v4 EQc2: Low-emitting materialsposted by Estra Marku on Jan 24, 2019, 11:56 am
Do all of the adhesive/sealant products used on our LEED v4 cs project need to be consistent with one testing method? For example, if one of our... |
|
Stormwater Management in a project without pre-existing infrastructureNC-v4 SSp1: Construction Activity Pollution Preventionposted by Amine Zeidane on Jan 25, 2019, 4:20 am
Hello, I'm working on a mixed-use tower construction project in Morocco. The site being near a pretty big river that crosses the city, coming from the ocean nearby, the contractor... |
|
Showers and Changing RoomsCS-2009 SSc4.2: Alternative transportation - bicycle storage and changing roomsposted by Ernst Schriefl on Jan 25, 2019, 4:39 am
Hallo, i have a question: For my project i would be required to provide 6 shower and changing facilities. My question is now if i provide a Changing room with a capacity of 10... |