ASHRAE 90.1 vs T-24 in californiaNC-2009 EAp2: Minimum Energy Performanceposted by Lance Collins on Jan 27, 2011, 4:24 am
Question: I am working on a new LEED-NC project in california that is using a modular/prefab construction type with mechanical systems that do not require permits via the T-24 code. The... Last reply: Tristan Roberts, Feb 8, 2011, 12:19 am |
|
Carpool dropoff area- for teachers or parents/students?Schools-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Renee Shirey on Jan 24, 2011, 11:47 am
Is the assumption that this area is to be designed for parents/students, or for teachers carpooling to work? Depending on the layout of the site, separation of bus drop-off from student drop-off... Last reply: Tristan Roberts, Feb 8, 2011, 12:16 am |
|
Building footprintCS-2009 SSc5.1: Site development - protect or restore habitatposted by MARIA GARCIA on Feb 4, 2011, 5:51 am
Hi all, Last reply: Tristan Roberts, Feb 8, 2011, 12:04 am |
|
CS projects should have 75% of GFA to earn this credit?EBOM-2009 SSc1: LEED Certified Design and Constructionposted by Bazeeth Ahamed Khader Mohamed Ali on Feb 2, 2011, 12:37 am
75% of "leasable area" makes more sense here. Last reply: Tristan Roberts, Feb 8, 2011, 12:03 am |
|
Off site water storageEBOM-2009 SSc6: Stormwater Quantity Controlposted by Prudence Ferreira on Feb 3, 2011, 6:56 pm
Our project site is a winery that directs stormwater to ponds which are later used for irrigation. The only thing is that the ponds are sometimes considerably distant from the LEED building.... Last reply: Tristan Roberts, Feb 7, 2011, 11:58 pm |
|
WEp1- Annual Days of OperationEBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by susan eguia on Feb 3, 2011, 5:41 pm
Hi, Appreciate any assistance. Thanks, Last reply: Tristan Roberts, Feb 7, 2011, 11:43 pm |
|
Option 1. Project in a LEED C&S precertified buildingCI-2009 SSc1: Site Selectionposted by Daniela Castro Salgado on Jan 24, 2011, 4:44 pm
We are trying to certify the interior of our office which is within a LEED precertified project. We will only get certification by the beginning of next year since the entire project is no yet... Last reply: Tristan Roberts, Feb 7, 2011, 10:50 pm |
|
2 things mat and chemical mixing areaCI-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by Sue Barnett on Feb 7, 2011, 4:23 pm
I have a major building entrance in my LEED boundary as well as some exterior entrances to a courtyard- do I need the mats to the courtyard area too? Last reply: Tristan Roberts, Feb 7, 2011, 10:46 pm |
|
Grade 2-5 Elementary SchoolSchools-2009 IEQc7.2: Thermal comfort - verificationposted by Kimberly Cullinane on Jan 29, 2011, 9:42 pm
Just confirming that we are still eligible for this credit even if our project is a grade 2-5 elementary school. In our case, we would just need to survey all teachers and staff? Last reply: Tristan Roberts, Feb 7, 2011, 10:07 pm |
|
Sample CalculationsNC-2009 WEc2: Innovative Wastewater Technologiesposted by Craig Phillips on Feb 3, 2011, 5:33 pm
I am finding it hard to locate a 1.0 or a dual flush 1.6/.8 toilet and flushometer. Where did the data come from in the sample calculations? Lyn Last reply: Tristan Roberts, Feb 7, 2011, 10:05 pm |