Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Exit Signs

EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lamps
posted by  Elena Grau  on 

Hi, I'd like to know which kind of luminaire means "exit signs". Does it means the constant light of the emergency lights? Thanks,

2
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Fri Aug 2, 2013, 11:19 am

Warehouse - Windows as part of roll up dock doors

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Charline SEYTIER  on 

We are working on a project that has a loading deck with an area inside at the perimeter of the warehouse that will be regularly occupied.

3
CEO, Co-owner.
ThemaVerde, France
LEEDuser Basic Member
15 thumbs up
Thu Aug 1, 2013, 2:48 pm

Paints off-site

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Mike D  on 

Are there any requirements on paints that are applied off-site on materials that are brought to site afterwards?

2
Thu Aug 1, 2013, 1:48 pm

FTE?

EBOM-2009 IEQc2.1:Occupant Comfort—Occupant Survey
posted by  John Kinch  on 

Hi there, I just wanted to confirm that for this particular credit we don't need to use FTE? We have a small staff here - 18 total staff members, only 6 of whom are full-time.

6
Default Avatar
ecoPreserve: Building Sustainability
LEEDuser Basic Member
101 thumbs up
Thu Aug 1, 2013, 1:16 pm

100% Recycled Fiber

EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materials
posted by  Elizabeth Felder  on 

Our building purchases generic toilet tissue and paper towels that state "100% recycled paper product" and "100% recycled fiber" on the box.

7
Thu Aug 1, 2013, 12:53 am

Credit Requirements

Pilot-Credits MRpc61:Material disclosure and assessment
posted by  Catherine Blakemore  on 

What exactly are the credit requirements? I read through the reference Pilot Credit 43 and also what I could find ON CEN (EN) standard 15804.

7
Wed Jul 31, 2013, 6:42 pm

LEED CI for Retail WEp1

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  Blythe Jopling  on 

Our store is located in a shopping mall where customers have no access to WCs in the shop, but use the WCs provided within the main shopping mall.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Jul 31, 2013, 4:48 pm

Mutiple Critical Zones

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Judith O'Driscoll  on 

Our review comments indicate that we need to show multiple critical zones for certain AHU but the ASHRAE 62.1 calculator seems to only allow input for 1 critical zone. How do I add additional?

3
Wed Jul 31, 2013, 4:24 pm

Distance calculation

EBOM-2009 MRc5:Sustainable Purchasing—Food
posted by  Magda Aghababyan  on 

Hi, In a situation where we buy a certain product from a retail supplier who is within the 100 mile radius, but the actual manufacturer is outside that limit is it still possible to pursue this cre

2
Instrumentation and Control Engineer / LEED AP BD+C
Dar Al Handasah
LEEDuser Basic Member
4 thumbs up
Wed Jul 31, 2013, 4:23 pm

Period & time of Breakdown

EBOM-2009 EAc3.2:Performance Measurement—System-Level Metering
posted by  Alexa Stone  on 

Hi all, I'm confused about when OR over what period of time does the breakdown need to capture. I understand that it needs to roll up to the EAc1 declared annual energy use (mbtu).

3
Default Avatar
ecoPreserve: Building Sustainability
LEEDuser Basic Member
101 thumbs up
Wed Jul 31, 2013, 4:13 pm