Topic | Recent |
---|---|
Metered faucet durationCS-v4 WEp2: Indoor water use reductionposted by Lisa Marshall on Sep 14, 2018, 4:37 pm
Hello, I have received a comment from a reviewer stating we needed to use the a duration of 30 seconds on a metered faucet. I don't know many people who wash hands for 30 seconds. What is the... Last reply: emily reese moody, Jun 10, 2019, 7:08 pm |
|
Inherently non-emitting: Gypsum board?CS-v4 EQc2: Low-emitting materialsposted by Ward Miller on Oct 1, 2018, 4:58 pmlanguage: https://leeduser.buildinggreen.com/forum/greenguard-gold-certificate Essentially, the Greenguard Gold standard means the product has tested at 0.22 mg/m3 TVOC, which falls in the "0.5 mg/m3... Last reply: Michelle Rosenberger, Jan 6, 2022, 11:00 am |
|
No showerNC-v4 WEp2: Indoor water use reductionposted by Ricardo Sá on Oct 3, 2018, 5:07 am
Hi, when a building does not include shower facilities (neither its occupants are expected to use any adjacent facility), how shall showers usage be treated in proposed building?... Last reply: Dave Hubka, Jun 30, 2023, 10:11 am |
|
Unknown or unavailable performance of fixturesNC-v4 WEp2: Indoor water use reductionposted by Ricardo Sá on Oct 16, 2018, 9:55 am
Hi, whenever actual performance of the installed equipments is not known (e.g. lack of appropriate technical datasheets, missing documentation, etc), is there any default to be considered... Last reply: emily reese moody, Oct 18, 2018, 11:23 pm |
|
Modelling free coolingCS-2009 EAc1: Optimize Energy Performanceposted by Ilaria Piong on Oct 24, 2018, 10:53 am
I have a Core and Shell building where there is an air-to-air heat pump. This HVAC system has the opportunity to do the free cooling in summer season when outdoor air temperatur is lower than... Last reply: Marcus Sheffer, Dec 17, 2020, 2:13 pm |
|
LEED V4 BD+C vs ID+CLEED Rating System Selectionposted by Tracy Marquis on Oct 28, 2018, 7:24 pm
We are renovating approximately 13,000 SF (with is about 50% of the first floor) of a 177,000 SF building. The renovation includes interior square footage as well as some major envelope work at... Last reply: David Eldridge, Jul 12, 2019, 2:48 pm |
|
water sense equivalent for a project with modular rooms made overseasHospitality-NC-v4 WEp2: Indoor water use reductionposted by Gail Napell on Oct 31, 2018, 7:51 pm
Hi all we have a US project with modular rooms being made overseas. the manufacturer asked if they can use the foreign equivalent approach for the WCs instead of using Water Sense labeled... Last reply: Gail Napell, Nov 2, 2018, 2:15 pm |
|
Modeling an Elevator with Glass Enclosure with an exterior Curtain WallNC-2009 EAp2: Minimum Energy Performanceposted by Fatou Jabbie, | Technology | Design and Engineering Plan Reviews | Energy Code Compliance | Sustainability | LEED AP BD+C on Nov 15, 2018, 10:11 am
Good morning. I am modeling an Elevator with Glass Enclosure with an exterior Curtain Wall and trying to figure out what is the best approach to (1)accommodate/capture the glass... Last reply: Marcus Sheffer, Nov 16, 2018, 12:13 pm |
|
LEED v4.1 is almost hereLEED v4.1 Discussion Forumposted by Paula Melton on Nov 30, 2018, 2:33 pmLast reply: Teresa Stern, Jan 28, 2019, 5:35 pm |
|
AIR TEST OPTIONNC-v4 EQc4: Indoor air quality assessmentposted by LUCY WILLIAMS on Dec 4, 2018, 12:56 pm
Have any teams successfully conducted and passed the air test? Can you provide any tips on how to do so? Last reply: Matthieu Kieken, May 22, 2020, 11:40 am |