Log in
Forum
Topic

Metered faucet duration

CS-v4 WEp2: Indoor water use reduction
posted by Lisa Marshall on Sep 14, 2018, 4:37 pm

Hello, I have received a comment from a reviewer stating we needed to use the a duration of 30 seconds on a metered faucet.  I don't know many people who wash hands for 30 seconds.  What is the...

Last reply: emily reese moody, Jun 10, 2019, 7:08 pm

Inherently non-emitting: Gypsum board?

CS-v4 EQc2: Low-emitting materials
posted by Ward Miller on Oct 1, 2018, 4:58 pm

language:  https://leeduser.buildinggreen.com/forum/greenguard-gold-certificate  Essentially, the Greenguard Gold standard means the product has tested at 0.22 mg/m3 TVOC, which falls in the "0.5 mg/m3...

Last reply: Michelle Rosenberger, Jan 6, 2022, 11:00 am

No shower

NC-v4 WEp2: Indoor water use reduction
posted by Ricardo Sá on Oct 3, 2018, 5:07 am

Hi,

when a building does not include shower facilities (neither its occupants are expected to use any adjacent facility), how shall showers usage be treated in proposed building?...

Last reply: Dave Hubka, Jun 30, 2023, 10:11 am

Unknown or unavailable performance of fixtures

NC-v4 WEp2: Indoor water use reduction
posted by Ricardo Sá on Oct 16, 2018, 9:55 am

Hi,

whenever actual performance of the installed equipments is not known (e.g. lack of appropriate technical datasheets, missing documentation, etc), is there any default to be considered...

Last reply: emily reese moody, Oct 18, 2018, 11:23 pm

Modelling free cooling

CS-2009 EAc1: Optimize Energy Performance
posted by Ilaria Piong on Oct 24, 2018, 10:53 am

I have a Core and Shell building where there is an air-to-air heat pump. This HVAC system has the opportunity to do the free cooling in summer season when outdoor air temperatur is lower than...

Last reply: Marcus Sheffer, Dec 17, 2020, 2:13 pm

LEED V4 BD+C vs ID+C

LEED Rating System Selection
posted by Tracy Marquis on Oct 28, 2018, 7:24 pm

We are renovating approximately 13,000 SF (with is about 50% of the first floor) of a 177,000 SF building.  The renovation includes interior square footage as well as some major envelope work at...

Last reply: David Eldridge, Jul 12, 2019, 2:48 pm

water sense equivalent for a project with modular rooms made overseas

Hospitality-NC-v4 WEp2: Indoor water use reduction
posted by Gail Napell on Oct 31, 2018, 7:51 pm

Hi all

we have a US project with modular rooms being made overseas.  the manufacturer asked if they can use the foreign equivalent approach for the WCs instead of using Water Sense labeled...

Last reply: Gail Napell, Nov 2, 2018, 2:15 pm

Modeling an Elevator with Glass Enclosure with an exterior Curtain Wall

NC-2009 EAp2: Minimum Energy Performance
posted by Fatou Jabbie, | Technology | Design and Engineering Plan Reviews | Energy Code Compliance | Sustainability | LEED AP BD+C on Nov 15, 2018, 10:11 am

Good morning. I am modeling an Elevator with Glass Enclosure with an exterior Curtain Wall and trying to figure out what is the best approach to  (1)accommodate/capture the glass...

Last reply: Marcus Sheffer, Nov 16, 2018, 12:13 pm

LEED v4.1 is almost here

LEED v4.1 Discussion Forum
posted by Paula Melton on Nov 30, 2018, 2:33 pm

A draft of some parts of LEED v4.1 for BD+C and ID+C is now...

Last reply: Teresa Stern, Jan 28, 2019, 5:35 pm

AIR TEST OPTION

NC-v4 EQc4: Indoor air quality assessment
posted by LUCY WILLIAMS on Dec 4, 2018, 12:56 pm

Have any teams successfully conducted and passed the air test?  Can you provide any tips on how to do so?  

Last reply: Matthieu Kieken, May 22, 2020, 11:40 am