Topic | Recent |
---|---|
mixed use building project (mainly residential)NC-2009 WEp1: Water Use Reductionposted by Tarek Dalati on Jan 29, 2011, 6:49 am
i m working on a mixed use building project (mainly residential) and i have the following question: Last reply: Karen Blust, Feb 12, 2011, 8:22 pm |
|
Min/Max Cooling/Heating air temperatures for ASHRAE 90.1NC-2009 EAp2: Minimum Energy Performanceposted by Jean Marais on Jan 25, 2011, 6:46 am
Is there a minimum/maximum delivery air temperature that must be up held for ASHRAE 90.1 (we're not talking about thermal comfort, but energy simulation...the fan power specification as per Appx... Last reply: David Hubka, Feb 12, 2011, 12:39 pm |
|
Hi Rachael, I'm notGeneral forumsposted by Ellen Mitchell on Feb 11, 2011, 6:27 pm
Hi Rachael, |
|
Baseline Fan Power: PFP and AHU Pressure RisesNC-2009 EAp2: Minimum Energy Performanceposted by Rodrigo Perez on Jan 31, 2011, 4:55 pm
We’re working on a 20 stories building that is seeking LEED NC v3 certification. This building considers ASHRAE’s #8 HVAC baseline system:... Last reply: David Hubka, Feb 11, 2011, 5:42 pm |
|
Design Submission- Table 1.8.1NC-2009 EAp2: Minimum Energy Performanceposted by Erika Duran on Feb 4, 2011, 3:02 pm
We're working on a Residential Project, after the design submission the certification body told us that It was not clear if the Baseline case fan power was modeled correctly. They want us... Last reply: David Hubka, Feb 11, 2011, 5:36 pm |
|
Graywater SystemNC-2009 EAp1: Fundamental Commissioning of Building Energy Systemsposted by Joseph Greene on Feb 11, 2011, 10:23 am
We have a graywater system in our building and I'm wondering if this would be subject to Fundamental Commissioning. Any thoughts? Last reply: Scott Bowman, Feb 11, 2011, 4:50 pm |
|
Clarification on minimum energy savings and EA credit 1NC-2009 EAp2: Minimum Energy Performanceposted by Joanne Haye on Feb 10, 2011, 11:12 am
I have a Client that is considering LEED certification, we have done a preliminary energy model, we show a 24% savings off the baseline. EA prerequisite 2 asks for a demonstration of 10% energy... Last reply: David Hubka, Feb 11, 2011, 4:46 pm |
|
Option 1 for MPR#6General forumsposted by Cara Mae Cirignano on Oct 1, 2010, 7:52 pm
Renee - Last reply: Tristan Roberts, Feb 11, 2011, 4:00 pm |
|
Activity Generated Electricity from a Manufacturing processNC-2009 EAc2: On-Site Renewable Energyposted by Kendal Neitzke on Feb 10, 2011, 4:08 pm
Our porject is a manufacturing facility that produces generators and converters for wind turbines. A component of the manufacturing process is the balancing of the generator rotors. A... Last reply: David Hubka, Feb 11, 2011, 2:22 pm |
|
can pavers around the green roof be counted as vegetated area?NC-2009 SSc7.2: Heat island effect - roofposted by yongmei gao on Feb 11, 2011, 12:21 pm
Our project has green roof around 28,000sqf on the total 68,000... Last reply: yongmei gao, Feb 11, 2011, 1:49 pm |