LEED CI Fried chicken restaurant
CI-2009 MRp1:Storage and Collection of Recyclablesposted by Jatuwat Varodompun on
I am working on a reastaurant project and have 3 questions 1 Do we need to provide Five types pd recycles as required by LEED or can we provide only the type of wastes generated by the building ty
Site Characteristics Percentage
NC-2009 PIf2:Project Summary Detailsposted by Patrick Reale on
For some reason our building to site ratio percentage is extremely high (197%). The building 4 floors with a basement and a rooftop mechanical room. The total sf is 155545sf.
what are your AGMBC Part II questions
posted by Tristan Roberts on
LEEDusers, I have the opportunity next week to speak with the team at USGBC that has been working on AGMBC Part 2. Yes, the long-awaited Part 2.
Commissioing of Process Energy Use
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Bill Holub on
Thanks in advance. I have seen conflicting directions on whether and which process system need to be Cx'ed.
TVOC Limit
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by matthew convery on
I am trying to determine if the VOC content in a flooring we used meets LEED standards.
Metering faucet for Ktchen sink
Retail-NC-v2009 WEp1:Water use reductionposted by Chinthaka Jagodaarachchi on
How to calculate the water saving if we use metering faucets for kitchen sink?
CDH standards
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Bruce Maine on
As a specifier, applying the Cal DPH standards can be like shooting in the dark.
Demand Control Ventilation
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Dylan Connelly on
I have a project with 14 small rooms (
Process energy? Exhaust Fan to relieve electric transformer heat
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Scott on
Our project has several spaces with electric transformers where we are using an exhaust fan and an outside air louver to relieve the heat loss from the transformer.
Regional Material Tracking with Multiple Forms of Transportation
NC-2009 MRc5:Regional Materialsposted by Karleigh Pihowich on
I have a material that was extracted 425 km from the manufacture point and transported by truck. After manufacture the material was shipped via rail to the project site which is 2076 km.