Gender Neutral toiletsNC-v4 WEp2: Indoor water use reductionposted by Jude Chakraborty on Mar 22, 2018, 7:48 pm
Hello, we are working on an University project which has a directive on Gender Neutral toilets which means there are no urinals in the building. Though it is great that the University is... Last reply: Kristen Dotson, May 23, 2018, 7:15 pm |
|
ERV and multiple fan coil unitsNC-2009 IEQp1: Minimum indoor air quality performanceposted by Courtney Royal on Mar 26, 2018, 11:33 am
Hello, I've only completed the ventilation spreadsheet a few times and have a few questions. Thanks! The project has an Energy Recovery Unit which feeds multiple ducted fan coil units... Last reply: Gustavo De las Heras Izquierdo, Jun 11, 2018, 6:38 pm |
|
"Prime Farmland, If Irrigated"?Determining Farmland or Floodplain Classification for SSc1posted by Colin Day on Jan 16, 2013, 6:26 pmHello, I am trying to determine if I would be able to a project claim this credit for a project my office is working on. The project is located on a previously developed urban site, has... Last reply: Ara Massey, Jan 29, 2014, 4:49 pm |
|
Healthcare Credit ApplicabilityUsing the LEED Pilot Credit Libraryposted by Kim Shinn on Sep 15, 2010, 1:20 pmI think you need to revise the table above. PC2 and PC3 are particularly applicable to Helathcare... Last reply: Tristan Roberts, Sep 22, 2010, 12:12 am |
|
v4 Form UploadsNavigating LEED Onlineposted by Michelle Rosenberger on Jul 1, 2016, 4:11 pmThanks for all the awesome insights into the new platform. Very helpful. But I am very confused about the v06 forms. I see that new version in my LEED 2009 project with EQcr4.1 not requiring any... Last reply: RETIRED, Nov 23, 2016, 12:15 pm |
|
IEQc4.3 Listing Floor Tile in form on LEED OnlineNC-2009 IEQc4.3: Low-emitting materials - flooring systemsposted by Melanie Blacklock on Apr 23, 2018, 12:50 pm
We have 17 different types of ceramic tile on a job I'm documenting in LEED Online. Since ceramic tile qualifies for... Last reply: Debra a. Lombard, May 11, 2018, 5:30 pm |
|
PIf3 Total number of residentsNC-2009 PIf3: Occupant and Usage Dataposted by Oscar Estevez on Apr 25, 2018, 9:46 pm
I have a Hospital project with one question on Table Plf3-3 Total number of residents: NOTE: Assume two residents per one-bedroom unit, three residents per two-bedroom unit, etc., unless... Last reply: David Eldridge, Aug 10, 2018, 4:02 pm |
|
Lack of Sunday bus serviceNC-v4 LTc5: Access to quality transitposted by Karen Joslin on Apr 27, 2018, 6:15 pm
I believe the intent of the emphasis on some level of weekend service means both Sat and Sun. If there are 0 trips on Sunday we cannot average with the high number of Sat trips can we? I have a... Last reply: Emily Purcell, May 2, 2018, 1:40 pm |
|
Pilot credits eligible for CampusNC-v4 INc1: Innovationposted by Chloe Naese on May 18, 2018, 3:56 pm
Hi, I was wondering what pilot credits were eligible to pursue for the Campus approach. I looked through the pilot credit library on USGBC's website but it not specifically mention anything about... Last reply: Deborah Lucking, Apr 13, 2020, 3:31 pm |
|
Efficient Refrigeration EquipmentCI-v4 EAc2: Optimize Energy Performanceposted by Michael Archer on May 22, 2018, 10:29 am
Under 'Further explanation - Exceptional Calculation method - Changes from earlier versions of ASHRAE and LEED', the CI reference guide states "All project types may count energy savings from... Last reply: Marcus Sheffer, May 22, 2018, 12:32 pm |