FAQs about EAp2 :

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

Multiple Buildings

Hello to everybody, I have to model multiple buildings in a field, it´s not a campus, but three of four buildings, some of which are served by the same group of chillers. As I understand, the energy modeling should be for each building and it´s corresponding baseline building, according to square footage and number of floors, for each of them, Please, let me know if I am in the right way, Thank you, Paula

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Tue, 09/03/2013 - 20:19

Hi - It might help to clarify which type of LEED submission you are pursuing? How you model the buildings might depend on whether these are totally separate LEED submissions, or whether you are pursuing a group submission? Either way, you will have to show calcs in some manner for each building individually. If they are being serviced by the same plant, you should probably review the District Energy guidelines which go over some of these issues. I think this is a current version: http://www.usgbc.org/Docs/Archive/General/Docs7671.pdf

Wed, 09/04/2013 - 16:08

Thank you Joseph, we are not sure yet how we are going to make the submission, I think that for the moment I will model every building by itself, Thank you for the link, May be latter in the process I will ask for some further help, thank you,