Forum quick links
Do transit bays count in property calculation
NC-2009 SSc2:Development Density and Community Connectivityposted by John Edwards on
I have a project that sits atop a subway station and across the street from a major local bus transfer facility, which consists of a lot of open space with bus queing lanes and passenger loading ba
Bio-fuel Boilers
NC-2009 EAc2:On-Site Renewable Energyposted by Martin Meehan on
From my reading of the Reference Manual for this credit it seems that Bio-fuel can only be used to generate electrical power on-site, and not to power bio-fuel boilers for water heating or space he
Sub-consultant to CxA
NC-2009 EAc3:Enhanced Commissioningposted by Lise Dannesboe on
Hi. We have a project over 50.000 sf, where an individual from the Owner is CxA. He would, however, like to hire a sub-consultant to handle some of the work during the construction phase.
Signatories
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by William Weaver on
I've noticed a subtle change with the most current templates. Particularly, the signatory for this credit no longer specifies who must sign the template.
C&S for a mixed use building
CS-2009 EAp2:Minimum Energy Performanceposted by Santiago Rodriguez on
Dear forum, We have a project that is seeking the C&S LEED Certification.
Multiple medical buildings on one campus
posted by Christopher Striegel on
I am on a project that has a medical campus of seven buildings of which five will require various levels of renovation.
Fancoils in the same Area
NC-2009 IEQp1:Minimum IAQ Performanceposted by Marina Andrade on
Hi! When two or more fancoils meet the same area, can be considered as a single zone, correct? Thanks!
Small Laundry Rooms and Exhaust
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Adam West on
Has anyone not exhausted a small laundry room in a commercial building and had this strategy approved through a review?
21 points
CS-2009 EAp2:Minimum Energy Performanceposted by Markievicz E on
Hi Guys I have a pleasant dilemma. The project is new build offices in climate zone 5a.
Applies to equipment as well as building lighting?
Healthcare-v2009 MRc4.1:PBT source reduction - mercury in lampsposted by Chris Flint Chatto on
We have a question whether this credit applies to lighting integrated with medical equipment, or if the credit only applies to permanently attached building fixtures, like the low-VOC and other MR