expected volume

NC-2009 MRp1: Storage and Collection of Recyclables
posted by Richardson Jean-Baptiste on Jul 5, 2017, 11:37 am

Hello all

How would one know the expected volume for a building, as well as the frequency of collection for a new project? Can one reference a similar building (similar in s.f. and type...

Last reply: Hana Altabbaa, Jun 28, 2018, 9:01 am

occupancy sensor in big offices

NC-v4 EAp2: Minimum Energy Performance
posted by Francesco Passerini on Jul 20, 2017, 5:44 am

I read in paragraph 9.4.1.2 b. that "an occupant sensor or a timer switch shall be installed (...) in: (...) 6. office spaces up to 76.2m2".
Does it mean that for bigger offices (i.e. 100m2...

Last reply: Marcus Sheffer, Jul 20, 2017, 12:08 pm

WaterSense Labelling Alternatives

CI-v4 WEp1: Indoor water use reduction
posted by Oliver Bate on Aug 2, 2017, 10:49 am

Hi!
Toilet (Water Closet); Urinals; Private Lavatory Facuet; and Showerheads all need to be WaterSense Labelled.
However- what are the equivalent labels? as per
"or a local...

Last reply: emily reese moody, Jul 19, 2018, 10:38 pm

Using Credits from Rating System Other than LEED as ID Credits

NC-v4 INc1: Innovation
posted by Kathleen Gaffney on Aug 3, 2017, 4:27 pm

I tried to find whether or not this question had been asked on the LEED v3 or LEED v4 comment thread but nothing seemed to rise to the surface.

The question: Can you take a credit from...

Last reply: Tristan Roberts, May 12, 2020, 10:01 am

District Energy Systems

NC-v4 EAp2: Minimum Energy Performance
posted by Bob Crowell on Aug 10, 2017, 2:08 pm

Marcus or anyone who knows the answer,

I have a squash facility that is being added on to an existing building.
The LEED Boundary does not include the plant.

1) The existing...

Last reply: Marcus Sheffer, Aug 10, 2017, 5:42 pm

Occupant comfort survey

CI-v4 INc1: Innovation
posted by Michael Smithing on Sep 13, 2017, 7:27 am

This credit in the innovation catalogue appears to be substantially similar to the CI credit (IEQc7.2) in the v3 rating system.  However, the credit language provided is not for "Establishment" (...

Last reply: emily reese moody, Mar 22, 2021, 1:37 pm

Bicycle racks distance when in garage

CS-v4 LTc6: Bicycle facilities
posted by David Lazaro on Sep 15, 2017, 7:58 am

When requiring bicyle racks are 30 metres from any functional entry to the building, what is the ruling regarding basements? In LEED v2009, a bicycle rack placed in the garage in a basement...

Last reply: Dave Hubka, Dec 10, 2018, 9:33 am

trees shading calculation

NC-v4 SSc5: Heat Island Reduction
posted by Loic Angot on Sep 15, 2017, 2:53 pm

Project Location : Canada, Ontario

Hi,

A question about shading calculation for heat island credit, non-roof measures.

In the LEED reference Guide (V4), the example...

Last reply: Deborah Lucking, Jul 20, 2021, 5:18 pm

Wet-applied Lubricants

NC-v4 EQc2: Low-emitting materials
posted by Megan White on Sep 18, 2017, 8:11 pm

Our project is looking at the "Never-Seez NS-160 Regular Grade Compounds" which is wet-applied onsite within the weatherproofing membrane.  Past posts from from v2009 show that "Lubricants" do...

Last reply: Ilia Khouri, May 17, 2022, 4:25 pm

LEED BD+C: Retail or LEED ID+C: Retail?

LEED Rating System Selection
posted by Borja Sánchez on Sep 27, 2017, 4:41 am

Hi, I have a doubt of what rating system is more adequate for a new LEED project that we are working on.

The project consists in a major renovation (it includes changes on façades,...

Last reply: Ricardo Filho, Dec 2, 2019, 8:02 am