expected volumeNC-2009 MRp1: Storage and Collection of Recyclablesposted by Richardson Jean-Baptiste on Jul 5, 2017, 11:37 am
Hello all How would one know the expected volume for a building, as well as the frequency of collection for a new project? Can one reference a similar building (similar in s.f. and type... Last reply: Hana Altabbaa, Jun 28, 2018, 9:01 am |
|
occupancy sensor in big officesNC-v4 EAp2: Minimum Energy Performanceposted by Francesco Passerini on Jul 20, 2017, 5:44 am
I read in paragraph 9.4.1.2 b. that "an occupant sensor or a timer switch shall be installed (...) in: (...) 6. office spaces up to 76.2m2". Last reply: Marcus Sheffer, Jul 20, 2017, 12:08 pm |
|
WaterSense Labelling AlternativesCI-v4 WEp1: Indoor water use reductionposted by Oliver Bate on Aug 2, 2017, 10:49 am
Hi! Last reply: emily reese moody, Jul 19, 2018, 10:38 pm |
|
Using Credits from Rating System Other than LEED as ID CreditsNC-v4 INc1: Innovationposted by Kathleen Gaffney on Aug 3, 2017, 4:27 pm
I tried to find whether or not this question had been asked on the LEED v3 or LEED v4 comment thread but nothing seemed to rise to the surface. The question: Can you take a credit from... Last reply: Tristan Roberts, May 12, 2020, 10:01 am |
|
District Energy SystemsNC-v4 EAp2: Minimum Energy Performanceposted by Bob Crowell on Aug 10, 2017, 2:08 pm
Marcus or anyone who knows the answer, I have a squash facility that is being added on to an existing building. 1) The existing... Last reply: Marcus Sheffer, Aug 10, 2017, 5:42 pm |
|
Occupant comfort surveyCI-v4 INc1: Innovationposted by Michael Smithing on Sep 13, 2017, 7:27 am
This credit in the innovation catalogue appears to be substantially similar to the CI credit (IEQc7.2) in the v3 rating system. However, the credit language provided is not for "Establishment" (... Last reply: emily reese moody, Mar 22, 2021, 1:37 pm |
|
Bicycle racks distance when in garageCS-v4 LTc6: Bicycle facilitiesposted by David Lazaro on Sep 15, 2017, 7:58 am
When requiring bicyle racks are 30 metres from any functional entry to the building, what is the ruling regarding basements? In LEED v2009, a bicycle rack placed in the garage in a basement... Last reply: Dave Hubka, Dec 10, 2018, 9:33 am |
|
trees shading calculationNC-v4 SSc5: Heat Island Reductionposted by Loic Angot on Sep 15, 2017, 2:53 pm
Project Location : Canada, Ontario Hi, A question about shading calculation for heat island credit, non-roof measures. In the LEED reference Guide (V4), the example... Last reply: Deborah Lucking, Jul 20, 2021, 5:18 pm |
|
Wet-applied LubricantsNC-v4 EQc2: Low-emitting materialsposted by Megan White on Sep 18, 2017, 8:11 pm
Our project is looking at the "Never-Seez NS-160 Regular Grade Compounds" which is wet-applied onsite within the weatherproofing membrane. Past posts from from v2009 show that "Lubricants" do... Last reply: Ilia Khouri, May 17, 2022, 4:25 pm |
|
LEED BD+C: Retail or LEED ID+C: Retail?LEED Rating System Selectionposted by Borja Sánchez on Sep 27, 2017, 4:41 am
Hi, I have a doubt of what rating system is more adequate for a new LEED project that we are working on. The project consists in a major renovation (it includes changes on façades,... Last reply: Ricardo Filho, Dec 2, 2019, 8:02 am |