Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

How to assign credits to team members in GROUP projects

LEED Guidance for Campuses and Multiple Buildings
posted by  Robert Wichert  on 

It looks like V.3 allowed assigning credits to individual team members, but USGBC/LEEDONLINE GROUP PROJECTS does not. Am I missing something?

17
Mon Sep 16, 2013, 4:58 pm

Multi Family

EBOM-2009 IEQc3.1:Green Cleaning—High-Performance Cleaning Program
posted by  Peter Doo  on 

For multi family apartment or condo buildings, I assume that the green cleaning would apply to the common areas only. Is this correct?

2
Mon Sep 16, 2013, 4:28 pm

Daylight controls in ALL daylit areas within 15 ft?

CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controls
posted by  Maria Porter  on 

Can we exclude conference rooms that have multi-scene controls? We don’t want daylight sensors here; we want to be able to dim for presentations etc.

2
Principal
Clanton Associates
LEEDuser Basic Member
46 thumbs up
Mon Sep 16, 2013, 12:16 pm

CO2 sensors in areas smaller than 150 sf

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Amanda Thomas  on 

In the LEED EBOM reference guide, spaces smaller than 150 sf do not have to provide CO2 sensors, according to California Mechanical Code Title 24.

4
Director of Operations
WorkingBuildings, LLC
LEEDuser Expert
39 thumbs up
Mon Sep 16, 2013, 11:06 am

Residential, Commercial vs Institutional

LEED Rating System Selection
posted by  Phillip Cook  on 

I am working on a building used to house sick children and their family after their treatment. It is not a healthcare building (i.e. no medical staff).

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Sep 16, 2013, 3:26 am

Process Energy Savings, Alternative Compliance Path

NC-2009 EAp2:Minimum Energy Performance
posted by  Santiago Rodriguez  on 

Dear forum, We are working with an industrial plant that is seeking to obtain the LEED Certification.

3
Fri Sep 13, 2013, 4:24 pm

Counting existing trees on site towards open space

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Mike Stopka  on 

I am trying to meet the 30% open space target. The project has plenty of open pedestrian-oriented hardscape area.

3
Default Avatar
Architect
Optimized Design Solutions
LEEDuser Basic Member
4 thumbs up
Fri Sep 13, 2013, 2:03 pm

Two Multi-Occupant Spaces with incomplete wall separation

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Annalise Reichert  on 

I am working on an educational facility and all multi-occupant spaces contain thermostat controls except for one classroom.

4
Thu Sep 12, 2013, 10:39 pm

Vending Machine Rated Power

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Lara Schneider  on 

Does anyone know what the rated power is for vending machines?

3
Thu Sep 12, 2013, 10:30 am

A/V Equipment

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Jennifer Preston  on 

We are compiling the equipment for a multi-floor office renovation. Dow e need to include A/V Equipment? Including ceiling speakers, projectors, projection screens, microphones, etc?

2
Thu Sep 12, 2013, 10:21 am