Topic | Recent |
---|---|
Drywall replaced on int. non-structural wallNC-2009 MRc1.2: Building reuse - maintain interior nonstructural elementsposted by Marisa Britton on Sep 18, 2017, 3:29 pm
If a non-structural wall is to have the studs remain but the drywall replaced, will that area still qualify for the MRc1.2 calculation? |
|
Earliest Possible C SubmittalCS-2009 PIf4: Schedule and Overview Documentsposted by GBD Architects on Sep 18, 2017, 7:49 pm
Hi, I'm trying to figure out what the earliest date is that we could deliver a LEED certification to our client, assuming no appeals, etc. I'm working out a timeline where I'm starting... |
|
Operable Windows as Eligible Thermal Comfort ControlsCI-v4 EQc1: Enhanced indoor air quality strategiesposted by Aviv Nitzan on Sep 20, 2017, 8:45 am
LEEDv4 states that operable windows are eligible thermal comfort controls. However, does not go into further detail if additional requirements (such as operable window area and distance from... |
|
LEED EBOM EA1 PR2- Casino HotelsEBOM-2009 EAc1: Optimize Energy Efficiency Performanceposted by Aron Weis on Sep 20, 2017, 7:19 pm
If a 6,000,000 square foot hotel/casino is more than 50% hotel space, are they required to use Option 1 - Portfolio Manager to get an Energy Star rating? If you look at most of the larger... |
|
Laundry Room not intended for housekeeping activities, chemical storage, mixing, or disposal.NC-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by Ashley Hu on Sep 21, 2017, 2:39 pm
Hi everyone, 1. Our project has a laundry room inside of an office space which is not intended for housekeeping activities, chemical storage, mixing, or disposal. Is physical... |
|
Envelope CommissioningCS-v4 EAc1: Enhanced Commissioningposted by Agnieszka Rylska on Sep 25, 2017, 12:49 pm
Hi, I have a question about Envelope Commissioning. For commercial building what tests are nessesery ? Air leakge testing is enough ? Or should I also test the building with thermal... |
|
Monitoring of constant volumen systemsCI-v4 EQp1: Minimum indoor air quality performanceposted by Gabriela Mena on Sep 26, 2017, 9:54 am
Hi, We have a project in Mexico City, the outdoor air system is a constant volume. A differential pressure switch is enough to comply with the pre requisite requirements? ... |
|
Wall Putty VOC content measured in gram/kgCS-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Kavita Gusain on Sep 29, 2017, 4:49 am
The test certificate for... |
|
ASTM E1903-97 Phase II Environmental Site Assessment- Local Equivalent documentationNC-2009 SSc3: Brownfield Redevelopmentposted by Adrie Fourie on Sep 29, 2017, 6:53 am
We are involved with a project outside of the US that undertook a... |
|
Farm on RoofCI-2009 SSc1: Site Selectionposted by Kristopher Croghan on Oct 2, 2017, 11:02 am
Our client currently has no landscape to maintain on site as this is a city office building. However, a roof farm is being considered. Would this roof farm be considered landscapting and... |