Acrylic Concrete Primer
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Nilufer Senses on
I wonder that under which category an "acrylic concrete primer" should be evaluated.
Use of rainwater collected offsite
NC-2009 WEc2:Innovative Wastewater Technologiesposted by John Covello on
Our project is considering creating a retention pond for rainwater on land adjacent to the LEED project.
All Spaces Excluded
Schools-2009 IEQc8.2:Daylight and Views—Viewsposted by Caleb Mactavish on
Hello, Our building has only 3 regularly occupied areas, all of which (according to CIRs and previous threads) can be excluded from view calculations.
Common schedule for VAV zones with differing occupancies?
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Scott on
What's the proper methodology for the following situation? Let's say I'm modeling a building that qualifies for a System #5 VAV baseline system and the four different spaces have different operati
the power of the baseline buliding design pump
CS-2009 EAp2:Minimum Energy Performanceposted by tiantian zhou on
Dear Sir/Madam, per G3.1.3.10, the baseline bulidnging design pump power shall be 349kW/1000 L/s.
LEED for Homes or LEED NC?
posted by Melissa Merryweather on
I've got a live-work project. 4 buildings, Each building is 6 to 8 townhouses, with single owners in each unit, but with lower 2 floors as office or workshop, upper 2 as living space.
Open Top Parking Garage - not SRI compliant
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Pat Thomas on
In Option 2 birds-eye view, you note that an Open Top Parking Level is not required to be SRI-compliant. I cannot find where this is specifically designated ?? Can you direct me ?? Thanks.
Tenant submetering
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Rudolph Carneiro on
We are confused as to what "centrally monitored" means. Does it mean that the building owner must install wiring infrastructure to monitor each tenant individually from a BMS or can the wiring be
Schools or NC according to the age of children
posted by MARCIO OROFINO on
We are working on a project of a school aimed to children aged 4 months to 5 years. Nevertheless, we were wondering wether this project may be classified as School Rating System.
Master Site - recycled content in landscape material
posted by Deborah Lucking on
Intrepid LEEDusers, The AGMBC indicates that MRc4 is not applicable for Master Site. How would we account for landscaping material that contains recycled content?