Topic | Recent |
---|---|
Aersol AdhesivesCI-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Alice Reeves on May 11, 2017, 4:42 pm
I have evidence that the aerosol adhesive I am using is below the % VOCs per weight limit provided in the LEED Reference Guide for Aerosol Adhesives. How do I record this information on the... |
|
Updated Water Sense Tool LinkNC-v4 WEp1: Outdoor water use reductionposted by Nick Semon on May 15, 2017, 2:31 pm
The location of the EPA's Water Budget Tool has been changed: https://www.epa.gov/watersense/water-budget-tool That's only... |
|
Mixed-use C&S buildingCS-2009 SSc4.4: Alternative transportation - parking capacityposted by Rodrigo Gomez Junco on May 16, 2017, 3:10 pm
Hi, We are pursuing Case 3 Option 1 for a mixed-use building with more than 10% commercial area, and will have to demonstrate that the parking capacity meets but does not exceed minimum... |
|
Appying the requirements in a High RisePilot-Credits EQpc78: Design for active occupantsposted by Donald Green on May 18, 2017, 1:21 pm
I saw a couple comments about applying the requirements of this Pilot Credit in a building other than 2 to 3 stories. The following are questions and comments. I am curious how it works in... |
|
Table IEQc7.1-1 Design Air Speed at 3 ft ht (ft/min)NC-2009 IEQc7.1: Thermal comfort - designposted by Ed Kokosa on May 23, 2017, 3:35 pm
I've seen previous versions of this question on the forum and the typical answer is to look at design information provided by diffuser manufacturers. |
|
Roof for SchoolSchools-NC-v4 EQc2: Low emitting materialsposted by Josh Inge on May 26, 2017, 3:54 pm
If you are trying to achieve the Schools–NC-v4 EQc2: Low emitting materials does the type of roof you use matter ? If you use a roof that has a modified bitumen base that is hot mopped and a... |
|
Joint CompoundSchools-2009 IEQc4.6: Low-Emitting Materials—Ceiling and Wall Systemsposted by Michele Helou on May 28, 2017, 2:58 pm
Joint Compound? Is it a sealant for IEQc4.1 or part of the wall system for IEQc4.6? I have a sealant that is low... |
|
what type of document required uploading to LEED ARCDiscuss the LEED Dynamic Plaque and Arcposted by Subrota Roy on May 29, 2017, 6:38 am
Hi, |
|
Atrium with reception deskCS-v4 EQc4: Daylightposted by Martin K on May 31, 2017, 9:00 am
Hi, can someone help me please with these questions? 1) we have an atrium space with a reception desk in the middle. According to the space matrix for LEED v2009 and definition of... |
|
Process water and residential unitsNC-v4 WEp2: Indoor water use reductionposted by MAUDE PINTAL on May 31, 2017, 1:46 pm
Our project includes a community center and a multi-residential part. The reference guide requires the following: |