Shuttle Service Alternate Compliance Path
CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Accessposted by Nandana Kumar on
Hi, We are applying for LEED CI rating for one of our project. This project owner will be providing shuttle buses as a Door-to-Door service for more than 90% of the project employees.
IEQ Credit 6.1
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Rezkar Abdulmajeed on
Hi, Can someone guide me please: I am pursuing Credit IEQ 6.1 Light Controls and would like to know if the ASHRAE 2007 standard as mentioned in the LEED requirement to be followed or the most re
Greenfield Site
CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Maya Karkour on
Hello, Our project is a greenfield site (agricultural land) in a sub-urban area, we have a building footprint taking ~all the site, so we didn’t protect any land on site but we didn’t disturb the u
Modeling Commercial Kitchen Energy Usage
NC-2009 EAp2:Minimum Energy Performanceposted by Dónal O'Connor on
Hi all, I would be grateful if somebody could direct me to any resources that outline how to accurately model commercial kitchen energy usage. Regards, Dónal
Irrigation of internal planting areas
NC-2009 WEc1:Water Efficient Landscapingposted by Victoria Lockhart on
Hi all, does anyone have experience of a project with irrigation demand for internal landscaping? Our project has ca.
Steel reporting for MRc5
NC-2009 MRc5:Regional Materialsposted by Tiffany Moore on
The reporting that I have used for steel on all my projects has been successful and met the expectations of the reviewers in terms of the point of manufacture and extraction.
Prerequisite denied - Appeal Solution
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Jean Marais on
1) So we're going to appeal our failed prerequisit (after finding the limit of 12 seconds on metering faucets).
Architect's responsibility
NC-2009 MRc5:Regional Materialsposted by Lilian Seow on
What is the Architect's role in ensuring credit achievement?
Cx for an addition
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Courtney Royal on
Are you required to Cx the systems only within the project scope and LEED boundary?
NC 2009 MPR Form 2 - actual vs estimated square footage
posted by Tyra Sorensen on
Under Gross Square Footage designed to be regularly occupied the pull down offers Actual or Estimated. In this case does Actual mean built and estimated is the take off from the drawing?