Forum quick links
Opaque panels
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
Similarly to the situation of this picture http://www.waymarking.com/gallery/image.aspx?f=1&guid=89c50354-3bc4-459b-a423-3b962523167c in the windows that I’m modelling there is a transparent pa
System 7: selection of heating system
NC-2009 EAp2:Minimum Energy Performanceposted by Roberto Oshiro Gama on
I,m working on a project were the proposed building has 2 ground water heat pumps with total capaciyt approx. 2300 kW.
T8 LED light specifications
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Mahbuba Khan AIA, LEED AP BD+C on
To achieve energy efficiency a project in Bangladesh is planning on buying T8 LED lights with following specifications.
Any info that you'd be willing to share on Green Globes?
posted by Amy King on
Hi Joseph, I know this comment is 3 years old, but wondering if you did any additional research into Green Globes and if you found any side-by-side comparisons w LEED?
Is there no opportunity for ID pt for data sharing in CI retail
Retail-CI-v2009 EAc3:Measurement and verificationposted by Valerie Molinski on
We are pursuing M&V on a CI for retal project. I do not see the option to receive the extra ID credit for the sharing of data that we checked in the PI template.
Tenant Guidelines for Large Project
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Abena Darden on
We're currently working on a very large student union building for a major California university, which is in its final design review phase.
Is it LEED certifiable?
posted by Marcio Alberto Casado Pereira on
We have the following development: a 50acre lot is going to be divided up in smaller units of 5000sqft and each lot will have a residence, a house.
RPc1 Durable Building- Consultant Responsibility
posted by Amanda Ross on
Hi there. Does anyone have experience submitting documentation for the Durable Building Credit?
PIlot Credit 42
Pilot-Credits PC42:Integrated Processposted by C. Anthony Menefee on
Can you choose to submit for Option 3 (Design Integrated Workshop), but not Option 2 (Concept Design Integrated Workshop)?