Flush Out using exhaust fans / natural ventilation
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Maya Karkour on
Dear All, Our project is aiming for the Flush-out option of this credit. 1) For the car parking (on the Ground Level), the air is exhausted by dedicated exhaust fans as per ASHRAE 62.1.
Tenant Sales or Lease Agreement
posted by Julie Hendricks on
I have several clients that are nearly refusing to provide a copy of their lease agreements because of concerns over confidentiality.
VAV terminal unit modulation
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Jorge Torres-Coto on
I have a Tenant Improvement that has VAV terminal units connected to an existing VAV AHU. The contractor and owner decided to save money and utilize stand alone control.
Industrial Park / Campus Program
ND-v2009 PIf1:Development Program and Site Typeposted by Rodrigo Gomez Junco on
We have a client who is planning on building an industrial park. Initially our idea was to approach the certification through the Campus Program.
Non-toxic Rodent Bait
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by Jerad Furze on
I am working on a project in Canada where the Pest Management vendor uses a product called "Detex Blox".
Project in Europe
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Anna Korinkova on
Are there any testing facilities in Europe capable of measuring SRI values? Our project can easily achieve this credit, however, we are not able to get SRI values from our suppliers.
Car-shared (zip car) parking spaces
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Kathy Kwong on
Can car-shared (zip car) parking spaces be accepted as low-emitting /fuel efficient vehicle parking in a project as compliance to option 1?
Steel manufacturer letter regarding raw materials extraction
NC-2009 MRc5:Regional Materialsposted by Lilian Seow on
Hi, I need help with interpretation with this letter which I'm sure some of you may have the same from the manufacturer.
Daylight control in Kitchen
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by Jatuwat Varodompun on
I am working on the restaurant project. For the kitchen with small windows, do I need to provide daylight sensor for this zone and how. thanks
WEp1 - Total Daily Usage Rates
CS-2009 WEp1:Water Use Reductionposted by Krista Wayne on
The comment has come up for several project so far and know that this partiualr problem is going to keep coming up in upcoming projects.