Topic | Recent |
---|---|
LEED Volume Program- Submittal GuidanceForum for LEED Volume Program Certificationposted by Grace Ming on Sep 4, 2013, 12:14 pm
Hello all, I am looking for the following documents regarding the LEED Volume certification: Last reply: Michelle Raigosa, Jun 18, 2015, 9:58 am |
|
Health Care vs Canada New Construction 2009NC-2009 EAc3: Enhanced Commissioningposted by Shevaun Barrie on Sep 5, 2013, 2:05 pm
Hi, Last reply: Shevaun Barrie, Sep 5, 2013, 4:24 pm |
|
ASHRAE 90.1-2007- Section 8.4- Voltage dropNC-2009 EAp2: Minimum Energy Performanceposted by Ali Helmy on Sep 8, 2013, 6:43 am
We are working on the LEED certification for a hospital building with 10 floors height. In ASHRAE Standard 90.1-2007 Section 8.4 the voltage drop limits are 2% for feeders and 3% for branch... Last reply: Marcus Sheffer, Jan 13, 2014, 8:50 am |
|
Open Top Parking Garage- not SRI compliantNC-2009 SSc7.1: Heat island effect - nonroofposted by Pat Thomas on Sep 10, 2013, 1:25 pm
In Option 2 birds-eye view, you note that an Open Top Parking Level is not required to be... Last reply: Deborah Lucking, Sep 23, 2013, 7:51 pm |
|
Trouble when presten credit complianceNC-2009 IEQc6.1: Controllability of systems - lightingposted by Mathilda Jonsson on Sep 12, 2013, 5:41 am
Hi Last reply: Heather Holdridge, May 29, 2018, 5:40 pm |
|
On-site Fuel CellsNC-2009 EAc2: On-Site Renewable Energyposted by Emilio Rovira on Sep 17, 2013, 1:23 pm
Can we use on-site fuel cells as an ID Credit? Last reply: Marcus Sheffer, Sep 17, 2013, 3:55 pm |
|
Daylight control in KitchenCI-2009 EAc1.2: Optimize energy performance - lighting controlsposted by Jatuwat Varodompun on Sep 17, 2013, 6:52 pm
I am working on the restaurant project. For the kitchen with small windows, do I need to provide daylight sensor for this zone and how. thanks Last reply: Agnes Vorbrodt, Nov 6, 2013, 5:21 pm |
|
Baseline during unoccupied hoursNC-2009 EAc1: Optimize Energy Performanceposted by Hans Wetterlund on Sep 20, 2013, 7:53 am
In an EAp2 appeal we were denied a 87 % cooling energy saving. The reviewer consider it unlighty to have cooling demand during winter during unoccupied hours. However, the Baseline system shall... Last reply: Marcus Sheffer, Sep 23, 2013, 10:57 am |
|
Enclosed space and 62.1 complianceNC-2009 IEQp1: Minimum indoor air quality performanceposted by Jatuwat Varodompun on Sep 21, 2013, 10:08 am
I am confused with the definition of the enclosed space. For instance, will a factory with the large area of a solid roof and metal grill (and from outdoor can flow in and out freely) count as an... Last reply: Rudolph Carneiro, Oct 7, 2013, 9:42 am |
|
Flush out in climate zone 1NC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Adi Negara, LEED AP BD+C on Sep 24, 2013, 5:52 am
Hi, does anyone here have ever implement flush out in a tropical climate area (climate zone 1 --> high temperature and humidity) and succeed obtaining this credit point? and what flush... Last reply: Dale Walsh, Oct 8, 2013, 2:16 am |