Log in
Forum
Topic

LEED Volume Program- Submittal Guidance

Forum for LEED Volume Program Certification
posted by Grace Ming on Sep 4, 2013, 12:14 pm

Hello all,

I am looking for the following documents regarding the LEED Volume certification:
1) LEED Volume Program: Submittal Guidance for Design and
Construction
2)...

Last reply: Michelle Raigosa, Jun 18, 2015, 9:58 am

Health Care vs Canada New Construction 2009

NC-2009 EAc3: Enhanced Commissioning
posted by Shevaun Barrie on Sep 5, 2013, 2:05 pm

Hi,
Does anyone know if there are any extra requirements aside from the optional BECx in LEED for HC vs Canada NC 2009? I can't see any but have been told there are more visits required. Am...

Last reply: Shevaun Barrie, Sep 5, 2013, 4:24 pm

ASHRAE 90.1-2007- Section 8.4- Voltage drop

NC-2009 EAp2: Minimum Energy Performance
posted by Ali Helmy on Sep 8, 2013, 6:43 am

We are working on the LEED certification for a hospital building with 10 floors height. In ASHRAE Standard 90.1-2007 Section 8.4 the voltage drop limits are 2% for feeders and 3% for branch...

Last reply: Marcus Sheffer, Jan 13, 2014, 8:50 am

Open Top Parking Garage- not SRI compliant

NC-2009 SSc7.1: Heat island effect - nonroof
posted by Pat Thomas on Sep 10, 2013, 1:25 pm

In Option 2 birds-eye view, you note that an Open Top Parking Level is not required to be...

Last reply: Deborah Lucking, Sep 23, 2013, 7:51 pm

Trouble when presten credit compliance

NC-2009 IEQc6.1: Controllability of systems - lighting
posted by Mathilda Jonsson on Sep 12, 2013, 5:41 am

Hi
The tenant for my LEED CI project will have desk lights for every working station but this will be brought to the new office from the old one. Therefore they are not included in the...

Last reply: Heather Holdridge, May 29, 2018, 5:40 pm

On-site Fuel Cells

NC-2009 EAc2: On-Site Renewable Energy
posted by Emilio Rovira on Sep 17, 2013, 1:23 pm

Can we use on-site fuel cells as an ID Credit?

Last reply: Marcus Sheffer, Sep 17, 2013, 3:55 pm

Daylight control in Kitchen

CI-2009 EAc1.2: Optimize energy performance - lighting controls
posted by Jatuwat Varodompun on Sep 17, 2013, 6:52 pm

I am working on the restaurant project. For the kitchen with small windows, do I need to provide daylight sensor for this zone and how.

thanks

Last reply: Agnes Vorbrodt, Nov 6, 2013, 5:21 pm

Baseline during unoccupied hours

NC-2009 EAc1: Optimize Energy Performance
posted by Hans Wetterlund on Sep 20, 2013, 7:53 am

In an EAp2 appeal we were denied a 87 % cooling energy saving. The reviewer consider it unlighty to have cooling demand during winter during unoccupied hours. However, the Baseline system shall...

Last reply: Marcus Sheffer, Sep 23, 2013, 10:57 am

Enclosed space and 62.1 compliance

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Jatuwat Varodompun on Sep 21, 2013, 10:08 am

I am confused with the definition of the enclosed space. For instance, will a factory with the large area of a solid roof and metal grill (and from outdoor can flow in and out freely) count as an...

Last reply: Rudolph Carneiro, Oct 7, 2013, 9:42 am

Flush out in climate zone 1

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Adi Negara, LEED AP BD+C on Sep 24, 2013, 5:52 am

Hi, does anyone here have ever implement flush out in a tropical climate area (climate zone 1 --> high temperature and humidity) and succeed obtaining this credit point?

and what flush...

Last reply: Dale Walsh, Oct 8, 2013, 2:16 am