Forum quick links
Form IEQp3-8
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Misha Volf on
Hi All, I newbie question: when the credit asks me to upload Form IEQp3-8, is this a form that I download somewhere and fill out, or is it just a document (or several documents) that I create myse
air testing in a mechanical room??
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Carrie Laurendine on
1) Do mechanical rooms need air quality testing? 2) There is an air handler unit that supplies air to multiple floors.
Systems Manual - third party PV system
NC-2009 EAc3:Enhanced Commissioningposted by Lisa Logan on
Reviewer said that we need to include the PV for our project in the systems manual. The PV was exisitng (previously commissioned) and is owned, operated and maintained by a third party.
eQuest 3.65 model
CS-2009 EAp2:Minimum Energy Performanceposted by František Bartoš on
Hello, I made model of quite simple rectangular office building in eQuest v3.65 and energy simulation run succcesssfully, but compliance analysis end with error code ""Error Assign zone to baselin
Carpooling, Ridesharing?
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Maria Porter on
First question: In SSc3.3 for CI reserved parking spaces for car/vanpools are to be at least 5 % of FTE. In NC SSc4.4 parking spaces should be reserved for 5 % of number of parking spaces.
Single zone VAV and 62MZ
NC-2009 IEQp1:Minimum IAQ Performanceposted by Noriko Nagazumi on
Hi. I'm working with a building that has a VAV that supplies OA to a single room based on the numbers of people on that space.
Paints & Coatings
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Caroline O'Leary on
I'm trying to determine if I have covered all of my bases for Paints & Coatings. I am working under LEED NC Retail 2009.
Project boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Sarah Dahman on
Hi! I'm working on a project which is a new office building. It includes underground parking for the building users.
Swimming pool Amenity facility
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Lilian Seow on
There's a swimming pool located in the lobby area as part of the amenity facilities for a multi-residential building. Is this a required area for IAQ c3.2 [flushout or air test] ?
First LEED Project. Which LEED System?
posted by IOANNIS LADOPOULOS on
I have a 6000sf existing building with almost 70% of it offices and 30% retail. All building is under the same management. I have the operation data for all months.