mixed use building project (mainly residential)

NC-2009 WEp1: Water Use Reduction
posted by Tarek Dalati on Jan 29, 2011, 6:49 am

i m working on a mixed use building project (mainly residential) and i have the following question:
1- for offices for example the daily usage is the summation of males usage and females...

Last reply: Karen Blust, Feb 12, 2011, 8:22 pm

Min/Max Cooling/Heating air temperatures for ASHRAE 90.1

NC-2009 EAp2: Minimum Energy Performance
posted by Jean Marais on Jan 25, 2011, 6:46 am

Is there a minimum/maximum delivery air temperature that must be up held for ASHRAE 90.1 (we're not talking about thermal comfort, but energy simulation...the fan power specification as per Appx...

Last reply: David Hubka, Feb 12, 2011, 12:39 pm

Hi Rachael, I'm not

General forums
posted by Ellen Mitchell on Feb 11, 2011, 6:27 pm

Hi Rachael,
I'm not absolutely sure about the...

Baseline Fan Power: PFP and AHU Pressure Rises

NC-2009 EAp2: Minimum Energy Performance
posted by Rodrigo Perez on Jan 31, 2011, 4:55 pm

We’re working on a 20 stories building that is seeking LEED NC v3 certification. This building considers ASHRAE’s #8 HVAC baseline system:...

Last reply: David Hubka, Feb 11, 2011, 5:42 pm

Design Submission- Table 1.8.1

NC-2009 EAp2: Minimum Energy Performance
posted by Erika Duran on Feb 4, 2011, 3:02 pm

We're working on a Residential Project, after the design submission the certification body told us that It was not clear if the Baseline case fan power was modeled correctly.

They want us...

Last reply: David Hubka, Feb 11, 2011, 5:36 pm

Graywater System

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Joseph Greene on Feb 11, 2011, 10:23 am

We have a graywater system in our building and I'm wondering if this would be subject to Fundamental Commissioning. Any thoughts?

Last reply: Scott Bowman, Feb 11, 2011, 4:50 pm

Clarification on minimum energy savings and EA credit 1

NC-2009 EAp2: Minimum Energy Performance
posted by Joanne Haye on Feb 10, 2011, 11:12 am

I have a Client that is considering LEED certification, we have done a preliminary energy model, we show a 24% savings off the baseline. EA prerequisite 2 asks for a demonstration of 10% energy...

Last reply: David Hubka, Feb 11, 2011, 4:46 pm

Option 1 for MPR#6

General forums
posted by Cara Mae Cirignano on Oct 1, 2010, 7:52 pm

Renee -
Yes, the owner must enter building data into Portfolio Manager periodically. However, the process is not onerous. Learn more at ...

Last reply: Tristan Roberts, Feb 11, 2011, 4:00 pm

Activity Generated Electricity from a Manufacturing process

NC-2009 EAc2: On-Site Renewable Energy
posted by Kendal Neitzke on Feb 10, 2011, 4:08 pm

Our porject is a manufacturing facility that produces generators and converters for wind turbines. A component of the manufacturing process is the balancing of the generator rotors. A...

Last reply: David Hubka, Feb 11, 2011, 2:22 pm

can pavers around the green roof be counted as vegetated area?

NC-2009 SSc7.2: Heat island effect - roof
posted by yongmei gao on Feb 11, 2011, 12:21 pm

Our project has green roof around 28,000sqf on the total 68,000...

Last reply: yongmei gao, Feb 11, 2011, 1:49 pm