Topic | Recent |
---|---|
Back of House Employee BreakroomNC-2009 WEp1: Water Use Reductionposted by Angie Allen on Sep 13, 2012, 11:52 am
We are working on a hotel project and I have one question regarding the fixture family classification for faucets. How should the back of house restroom associated with the employee breakroom be... Last reply: Angie Allen, Sep 14, 2012, 10:24 am |
|
District Heating and Cooling Distribution ProblemsNC-2009 EAc1: Optimize Energy Performanceposted by Dawn Kowalik on Sep 14, 2012, 9:34 am
The project is such that it consists of two major renovations of two college buildings and the construction of a new link between them. The energy model is just of ONE building. However, the... Last reply: Marcus Sheffer, Sep 18, 2012, 5:15 pm |
|
Residential and nonresidential spaces in the same buildingNC-2009 EAc1: Optimize Energy Performanceposted by Francesco Passerini on Sep 17, 2012, 5:10 am
I’m modelling a hotel in which three floors are occupied by rooms (residential, tot. area 733m^2) and two floors (one underground) are occupied by services and a wellness centre (non-residential... Last reply: Marcus Sheffer, Sep 19, 2012, 9:10 am |
|
LPD and EA credit 1CS-2009 EAc1: Optimize Energy Performanceposted by Alex AC on Sep 19, 2012, 3:31 pmweighted average. Log in or register to post comments Alex AC LEEDuser Basic Member 6 thumbs up September 20, 2012- 12:03 pm I see. It´s all clear now. Glad to have you as a member of this forum. Have a nice... Last reply: Marcus Sheffer, Sep 25, 2012, 3:34 pm |
|
Data Centers- Efficiency for UPS and computer servers for theNC-2009 EAp2: Minimum Energy Performanceposted by Carlos Garcia on Sep 25, 2012, 8:24 am
Dear all Last reply: Marcus Sheffer, Mar 12, 2013, 6:08 pm |
|
Modelling of Zone EquipmentNC-2009 EAp2: Minimum Energy Performanceposted by Jean Marais on Sep 26, 2012, 10:48 am
I have 222 thermal zones. This is a standard size project. I am trying to increase the turn around time on my current simulation. For the proposed design model: Last reply: Marcus Sheffer, Oct 15, 2012, 2:38 pm |
|
LEED ReviewersLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Nathan Lee on Sep 26, 2012, 9:57 pm
I am curious if there is a list of companies that are subcontracted by USGBC/... Last reply: Paul Diaz, May 13, 2013, 1:44 pm |
|
Public Comment responsesGeneral forumsposted by Bill Swanson on Oct 2, 2012, 4:48 pm
I don't see responses to the 4th Draft. Anyone know where to find them? Last reply: Bill Swanson, Oct 23, 2012, 10:19 am |
|
Office Building with Data CenterNC-2009 EAc1: Optimize Energy Performanceposted by Lise Dannesboe on Oct 3, 2012, 7:31 am
I have a possible case with a office building that also contains a large Data Center. The data center is only 2 % of the square meters, but accounts for about 85 % of the preliminary assumed... Last reply: Tristan Roberts, Nov 27, 2017, 9:36 am |
|
Number of testing pointHealthcare-v2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Emil Andersson on Oct 9, 2012, 4:00 am
Hi. The credit language states that the number of sampling locations will depend on the size of the building and the number of ventilation systems. We have 21 identical built... Last reply: Emil Andersson, May 31, 2013, 5:03 am |