Log in
Forum
Topic

Existing Building Reuse--all bldgs or only those you renovate?

General forums
posted by Nadav Malin on Apr 12, 2012, 2:23 pm

Hi folks,
I'm looking at the Existing Building Reuse language. I've always assumed that it applies to all existing buildings that are retained within the project area, but I'm hearing from...

Last reply: Meghan Bogaerts, Jun 6, 2012, 9:25 am

Project in Europe and Energy Star

CI-2009 EAp2: Minimum Energy Performance
posted by Maria Porter on Apr 13, 2012, 7:04 am

I’m starting to realize that it will be hard to find Energy Star rated equipment in Sweden. Computers – no problem, but for fridges, dishwashers etc we use the European EU energy rating system....

Last reply: Bill Swanson, Aug 2, 2012, 8:48 am

Certify ONLY One Office Space Within a Building?

EBOM-2009 EAp2: Minimum Energy Efficiency Performance
posted by Michelle Bracewell-Musson on Apr 22, 2012, 9:42 pm

Is EBOM limited to...

Last reply: Eric Johnson, May 25, 2012, 9:35 am

Vegetated areas

NC-2009 SSc6.2: Stormwater design - quality control
posted by Patricia Missawa on Apr 23, 2012, 2:36 pm

I’m having some doubts on how to define the stormwater volume treated by different types of vegetated areas since in Brazil we don’t have any study related to it.
1- If my project has a...

Last reply: Michael DeVuono, Oct 10, 2012, 1:24 pm

Continuous insulation on the inside of the wall?

NC-2009 EAp2: Minimum Energy Performance
posted by David Sheridan on Apr 24, 2012, 10:45 am

Our state energy code is based on ASHRAE 90.1-2004, which I believe does not require ci for exterior walls. ASHRAE 90.1-2007 requires R-3.8 ci for nonresidential walls. The project architect...

Last reply: Marcus Sheffer, Apr 24, 2012, 2:07 pm

Residential unit spaces are regularly occupied?

NC-2009 IEQc8.2: Daylight and views - views
posted by Jean Marais on Apr 25, 2012, 9:28 am

NC project with some residential units included...

1) Which residential unit spaces are regularly occupied?
- lounge
- bedroom
- children's bedroom
- open plan...

Last reply: Lisa Sawin, May 21, 2012, 11:18 am

Separating High Energy Consumer as a "Process Load"

NC-2009 EAp2: Minimum Energy Performance
posted by Todd LaFreniere on Apr 26, 2012, 5:38 pm

I have a project that is just starting and we have a somewhat unique situation. The building is a 2-story office building and the computers being used within the building are server grade...

Last reply: Marcus Sheffer, May 3, 2012, 12:13 pm

+50% Alteration?

EBOM-2009 MRc3: Sustainable purchasing - facility alterations and additions
posted by Michelle Bracewell-Musson on Apr 27, 2012, 9:34 am

I have come across this on more than one occasion and different projects (CI and...

Last reply: John McFarland, Aug 2, 2012, 3:40 pm

Plant Confusion

EBOM-2009 SSc2: Building Exterior and Hardscape Management Plan
posted by Elizabeth Crenshaw Hammitt on Apr 28, 2012, 7:07 pm

Our building staff maintains one small (less than 1,000 sq feet or so) Memorial Garden that we do not own, and several very small beds of vines and trees on the side walk surrounding our building...

Last reply: Jason Franken, Oct 11, 2012, 9:55 am

UCSC Master Site

LEED Guidance for Campuses and Multiple Buildings
posted by James Sherman on May 1, 2012, 4:22 pm

Hi, my name is Nathan Retzlaff and I am interning with James Sherman at UC Santa Cruz where we are in the process of registering UCSC as a master site. Our campus is very big and contains many...

Last reply: Simon Sue, May 30, 2012, 3:05 am