site selection C1

NC-2009 SSc1:Site Selection
posted by  Elisa Sequeros  on 

I would like to do the exam LEED AP and I have a very specific question : FOR A PREVIOUSLY UNDEVELOPED SITE, WHAT WATER BODIES DO NOT HAVE TO MEET THE 50-FOOT SETBACK CRITERIA TO COMPLY SUSTAINAB

2
Sustainable Building Consultant
Green Bridge Consulting
LEEDuser Expert
28 thumbs up
Mon Jan 27, 2014, 7:20 am

Entryway Grates and Mats

EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Control
posted by  Elizabeth Felder  on 

The building has entryway grates a few feet in length in the vestibule of all building entrances.

4
Mon Jan 27, 2014, 2:17 am

PVC floor adhesive

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Valentin Grimaud  on 

Dear experts, we are purchasing the PVC floor adhesive, but i'm not sure which category is more suitable for this kind of adhesive in leedonline form, we considered "Rubber Flooring Adhesives" but

2
Sun Jan 26, 2014, 8:58 am

Outdoor Measurement Device location

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Carolina Vergnano  on 

We are working on a project that has a fancoil located on the top of the building that will treat the outdoor air and deliver it to each non densely occupied zone.

5
Sat Jan 25, 2014, 2:37 am

EQc3, EQc5 and filtration requirements

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Steve Loppnow  on 

I'd like to confirm that if a project is pursuing EQc5, that they must use MERV 13 filters for flush-out but can still use MERV 8 filters on equipment that is operated during construction.

7
Default Avatar
Systems Director
HOLOS
LEEDuser Basic Member
15 thumbs up
Sat Jan 25, 2014, 2:30 am
3
Fri Jan 24, 2014, 5:57 pm

CSI Masterformat

NC-2009 MRc4:Recycled Content
posted by  K Nakamura  on 

We have a project that is using CSI MasterFormat 1995, instead of 2004.

5
Default Avatar
LEEDuser Expert
472 thumbs up
Fri Jan 24, 2014, 4:15 pm

Informal Space in a University Setting

Calculating FTEs
posted by  Mike Manzi  on 

Does anyone have any experience with having a large informal waiting space outside of classrooms and determining a transient load.

4
Thu Jan 23, 2014, 11:13 pm

Elevator motors requirements

NC-2009 EAp2:Minimum Energy Performance
posted by  Alex Parella  on 

Sould all kind of elevator motors comply with the requirements of Chapter 10.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Jan 23, 2014, 6:36 pm

Enforcement of LE/FE Parking Spaces

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Michael Gillen  on 

I had posted a question about the LE/FE signage and an announcement by the company that they were available for general parking after 8:45 AM.

4
LEED AP BD+C, O+M, Green Globes Professional
JLL
LEEDuser Basic Member
112 thumbs up
Thu Jan 23, 2014, 6:35 pm