Log in
Forum
Topic

Increase in FTE during performance period

Performance Period
posted by Matthew Perna on Apr 25, 2011, 2:50 pm

The top floor of our 4 story building was fit out and rented toward the end of our performance period (it was...

Last reply: Dan Ackerstein, May 11, 2011, 12:33 pm

Retaining rainwater for future uses

CS-2009 SSc6.1: Stormwater design - quantity control
posted by Gabriela Hernández Castillo on Mar 23, 2011, 4:24 pm

Will capturing all rainwater and keep it in a tank for future uses such as cooling towers and irrigation? Our project will not infiltrate it but...

Last reply: Gabriela Hernández Castillo, May 11, 2011, 12:30 pm

62MZ Calculation for IEQ2- For VAV Systems

Schools-2009 IEQc2: Increased Ventilation
posted by Laura Long on Nov 24, 2010, 4:19 pm

The LEED Reference Guide only addresses the increased ventilation calculation at the zone level, not the system level. I understand that the outdoor air supplied to each zone needs to be...

Last reply: Julia Weatherby, May 11, 2011, 9:58 am

specific mechanical drawings for PI4?

General forums
posted by Erica Downs on Apr 4, 2011, 2:59 pm

Does anyone know specifically which "mechanical" drawings...

Last reply: Kimberly Frith, May 11, 2011, 9:12 am

Increase Ventilation- Corridor

CI-2009 IEQc2: Increased Ventilation
posted by Simon Sue on May 10, 2011, 2:32 am

Hi,
we intend to attempt this credit, but come across on our design that we does not have any dedicated FCU serving on this corridor. the corridor is a simple walkway for employees walk...

Last reply: David Hubka, May 10, 2011, 2:48 pm

Remnant Limestone- any LEED credit there?

CS-2009 MRc3: Materials Reuse
posted by Julie Hendricks on May 9, 2011, 4:37 pm

My client wants to use remnant limestone (basically pieces of limestone left over when larger pieces are cut) for exterior siding. My instinct tells me these pieces won't count as either...

Last reply: Julie Hendricks, May 10, 2011, 9:29 am

Occupancy Sensor

CI-2009 EAp2: Minimum Energy Performance
posted by Simon Sue on May 9, 2011, 3:40 am

We have a project which has a big " function" area . this particular area is for employees to hang out + meet up with customers + briefing area (with a formal meeting table, projectors). do we...

Last reply: Kimberly Frith, May 10, 2011, 8:23 am

LEED CI v3 in a central London building 3 out of 40 floors

CI-2009 EAp2: Minimum Energy Performance
posted by R Jones on Sep 6, 2010, 10:53 am

I am trying to undertake the assessment of EAp2 and EA1 energy credits for a building in central London. Its about 40 floors but the project scope is to renovate only 3 floors. None of the...

Last reply: Eszter Gulacsy, May 10, 2011, 7:51 am

EAPr2- Lighting Control (shut-off control and space control)

CI-2009 EAp2: Minimum Energy Performance
posted by Ramesh Narayanan on Feb 25, 2011, 1:55 am

Could you please anybody elaborate what is the difference between the shut-off device control requirement and speace control device requirement mentioned in the Ashrae standard lighting mandatory...

Last reply: Simon Sue, May 10, 2011, 3:12 am

Five year shade calculation.

NC-2009 SSc7.1: Heat island effect - nonroof
posted by sara frye on Apr 27, 2011, 4:34 pm

Apologies in advance as I know I have read the answer to my question somewhere. I just can't find it. WHEN should the five year shade calculation be performed? i.e time of day, time of year?...

Last reply: Jacob Arlein, May 9, 2011, 8:16 pm