Log in
Forum
Topic

Who can be CxA?

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Allan Vásquez on Dec 9, 2014, 3:31 pm

Hi,
I’m looking for some help with the Commissioning Authority experience. The first question is:
How do I know which projects are similar managerial and technical complexity than the...

Store

General forums
posted by Bill Swanson on Dec 10, 2014, 3:51 pm

I'd like to see a LEEDuser store. Every once in awhile I see a new document that has been created by LEEDuser for download. Something like "The Missing Manual". Some of these cost money, some...

Job Specific Environment Analysis

NC-2009 SSp1: Construction Activity Pollution Prevention
posted by Yodi Danusastro on Dec 12, 2014, 2:58 am

Does anyone has the template of JSEA? I've been ask to create...

Previously developed or graded land

NC-2009 SSp1: Construction Activity Pollution Prevention
posted by SoYoung Lee on Dec 15, 2014, 12:37 am

We are planning to pursue LEED certification for the official buildings. The site areas are being developed for those municipal buildings relocation and as part of the urban redevelopment (or,...

Prefinished wood flooring: alternative to emissions testing?

NC-2009 IEQc4.3: Low-emitting materials - flooring systems
posted by Sue Clark on Dec 15, 2014, 3:57 am

We are specifying an...

Supplementary mechanical ventilation in naturally ventilated

CI-2009 IEQp1: Minimum indoor air quality performance
posted by Michael Smithing on Dec 15, 2014, 10:05 pm

Our project is primarily naturally ventilated and meets the requirements of Section 5.1 in non-core areas. We have added mechanical ventilation to the core areas which meet the requirements of...

Golf Course

CS-2009 SSc1: Site Selection
posted by AtSite Inc on Dec 16, 2014, 2:36 pm

Our project is being developed on a former golf course. I'm having trouble understanding if a golf course would be considered "previously developed" in that it certainly had some grading and was...

adjustable Dual Flush valve

NC-2009 WEc3: Water Use Reduction
posted by Faisal on Dec 17, 2014, 1:14 am

Hi,

we are evaluating a dual flush valve for WC, which give us 6 & 9 Litres per flush(adjustable) which aggregates to 7 litres per flush, our project requirement is 3.023 Litres per...

Stability and predictablility is needed...

General forums
posted by Robert Andrews on Dec 18, 2014, 3:39 pm

Nadav, as usual, a well-thought out article making excellent points. My frustration is that this "waffling" sends a bad message to the ultimate users of the LEED program, who are the building...

"Determination of Ds Value for worst case scenario"

CI-2009 IEQp1: Minimum indoor air quality performance
posted by Cyriac Joseph on Dec 24, 2014, 12:32 pm

How do we calculate the Ds value for the condition where "The cooling load is low due to minimal envelope and internal loads but the number of occupants are at peak?"
We have the following...