Topic | Recent |
---|---|
Installed and not Installed HVACCS-2009 EAp2: Minimum Energy Performanceposted by Paula Hernandez on Jan 3, 2020, 9:50 am
Hi, I am modeling a C&S building for the Construction Submittal, and I have to adjust the Design Submittal Energy Model because the Owner change the brand of the VRF systems. ... Last reply: Paula Hernandez, Jan 8, 2020, 6:10 am |
|
International Compliance PathNC-v4.1 MRc4: Material Ingredientsposted by Martha Lewis on Jan 8, 2020, 7:44 am
Very curious why both LEED 4 and 4.1 restrict the Candidate List to "the version in effect June 2013"? The wording appears to indicate that of the 3 lists, only the Candidate list is restricted... Last reply: Tristan Roberts, Jun 11, 2020, 1:14 pm |
|
Project in a resort attached to casino that allows smokingNC-v4 EQp2: Environmental tobacco smoke controlposted by Anna Kaelin on Jan 10, 2020, 12:47 pm
I have a client planning a complete fit-out of one of their retail spaces. The project is located in a resort in Las Vegas, which is attached to a Casino that allows smoking. Smoking is... Last reply: Guilherme Pansanato, Aug 5, 2024, 8:36 am |
|
Regularly OccupiedNC-v4.1 EQc9: Acoustic performanceposted by Martha Norbeck on Jan 14, 2020, 12:42 pm
The credit language reads all "occupied spaces." Is that really the intent? Or is it all "REGULARLY occupied" spaces? Last reply: Dionisio Franca, Apr 5, 2023, 10:58 pm |
|
CDPH method 1.2 for LEED V4NC-v4 EQc2: Low-emitting materialsposted by Omar Elrawy on Jan 14, 2020, 4:56 pmguidance. Please see on this discussion for more (https://leeduser.buildinggreen.com/forum/emissions-testing-previous-cdph-v11-2010-vs-cdph-v12-2017) I do not have answer for the Calculator. Someone else... Last reply: DuWayne Baird, Feb 1, 2020, 5:42 am |
|
CI v4: Project only uses LED lighting- still need calculator?EBOM-v4 MRc2: Purchasing - lampsposted by RDK E&S on Jan 15, 2020, 4:50 pm
Hello, We are attempting this credit for an Innovation point for a v4 CI project. Within the CI scope, only LEDs have been installed. Is a calculator still required if there are no lamps... Last reply: Mark Zoeteman, Feb 11, 2021, 6:00 pm |
|
Automatic Receptacles LEED InterpretationNC-v4.1 EAp2: Minimum Energy Performanceposted by Sofia Barahona on Jan 17, 2020, 8:10 am
We are attempting to work on a project in LEEDv4.1, which in Optimize Energy Performance states that ASHRAE 90.1-2016 mandatory provisions must be met. However we are wondering if the following... Last reply: Sofia Barahona, Mar 6, 2020, 10:59 am |
|
Whole-Building Life-Cycle Assessment- Assessment ToolsNC-v4 MRc1: Building life-cycle impact reductionposted by Ricardo Filho on Jan 21, 2020, 4:46 am
Hi All, Last reply: Jennifer O'Connor, Jan 22, 2020, 7:25 pm |
|
LEED AP certificateCI-2009 IDc2: LEED Accredited Professionalposted by Rowena Rawte on Jan 22, 2020, 1:04 am
Is the LEED AP certificate of BD+C accepted for ID+C projects? Or would a Legacy LEED AP certificate be accepted - We have both persons working on the project not sure which to upload. Can... Last reply: Rowena Rawte, Jan 23, 2020, 11:44 pm |
|
Software limitationsNC-2009 EAp2: Minimum Energy Performanceposted by Nicolas Martinez Ochoa on Jan 22, 2020, 10:04 am
Hello I have issues simulating a water cooled coil (software limitations), and so I’m trying to simulate an equivalent thermodynamically system. I want to know if this methodology is valid... Last reply: Nicolas Martinez Ochoa, Jan 24, 2020, 11:10 am |