Topic | Recent |
---|---|
LEED Regional Priority Credit DatabaseGeneral forumsposted by Nathan Lee on Sep 7, 2011, 2:05 am
Question regarding the RPC database lookup. Looking into registering a project located in Seoul and tried entering the local zip code, but getting an invalid zip code error. The strange part is,... Last reply: Susann Geithner, Sep 7, 2011, 2:27 pm |
|
Seawater flushingCI-2009 WEc1: Water Use Reductionposted by Edwin Wealend on Jul 25, 2011, 2:46 am
Hi We are working on new LEED-CI project in Hong Kong that uses sea water for... Last reply: JOHN BURNETT, Sep 7, 2011, 1:45 am |
|
Definition of IntersectionsPilot-Credits PC9: Street Networkposted by Ricky Li on Sep 6, 2011, 11:17 pm
Hi, I am trying to apply this credit to one of my project. The credit requirement states that "Publicly accessible alleys may be counted" as intersections. For the alleys connecting two streets,... |
|
Polymerized urea formaldehyde resinNC-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Katie Ellsworth on Aug 16, 2011, 2:48 pm
We have laminated particleboard also known as melamine panels which states it's formaldehyde free but has polymerized urea formaldehyde resin in it. Can we still get EQ credit for it? Last reply: Dimitris Klapsis, Sep 6, 2011, 8:07 pm |
|
blower tests in mexicoNC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by marisol cano on Sep 6, 2011, 1:44 pm
Hi, we need to make a blower door test for a Hampton Inn Hotel in Ciudad del Carmen, Mexico. No one in Mexico will do it for us. Anyone knows someone in the US who can do it for us here? |
|
Site Master Plan- Light Pollution ReductionSchools-2009 SSc9: Site Master Planposted by Anya Fiechtl on Aug 10, 2011, 11:06 pm
Has anyone completed the... Last reply: Dan LeBlanc, Sep 6, 2011, 1:25 pm |
|
Master Plan vs. LEED Project BoundarySchools-2009 SSc9: Site Master Planposted by Dana Murdoch on Aug 9, 2011, 10:31 am
Does the master plan need to be the same as the LEED Project Boundary? We have a project where the public school district is adding a building to their existing 'junior high campus'. However, we... Last reply: Dan LeBlanc, Sep 6, 2011, 1:16 pm |
|
MicroClimate Factor (Kmc) for Baseline and DesignNC-2009 WEc1: Water Efficient Landscapingposted by Maya Karkour on Jul 26, 2011, 9:50 am
Hi All, So I know that the MicroClimate Factor (Kmc) must be the same for the Baseline and the Design, but what if the Landscape types in the Baseline and the Design are not the same at... Last reply: Susann Geithner, Sep 6, 2011, 9:38 am |
|
Warehouse Flush OutNC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Curt Pascoe on Jun 28, 2011, 4:02 pm
Both NCv2.2 and v2009 are clear with the temperate and humidity constraints. However, how does one apply a flush-out to a warehouse in northern climates with heat but no AC or methods to... Last reply: Allison Beer McKenzie, Sep 6, 2011, 8:27 am |
|
Enhanced creditGeneral forumsposted by J.R. Anderson on Sep 5, 2011, 2:28 pm
Could an enhanced crdt be created for the application of fixture equipment for more aeas than just the project aea?? overall acceptable approach. |