Shoe removal and storage space in place of walk off matsNC-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by John Covello on Apr 25, 2014, 3:20 am
Hello, I am with a sustainable resort project in Thailand. Our project has designed shoe storage space in the front of each guest room instead of having walk off mats. LEED Homes 2008 EQ... |
|
Choice between LEED NC & LEED HCLEED for Healthcare forumposted by Maya Karkour on Apr 28, 2014, 11:55 am
Dear All, We have a potential hospital outside the US which needs to be registered under LEED. The building will be a fully functioning hospital (including surgery rooms and ~400... |
|
Concerning ANSI/BIFMA manufacture dateCI-2009 IEQc4.5: Low-emitting materials - systems furniture and seatingposted by Jaida Anderson-Lozano on Apr 29, 2014, 7:25 am
Currently our furniture products use Greenguard Certificates and ANSI/BIFMA testing standard as compliance paths for this credit. When we complete the table IEQc4.5-1 in LO columns 'manufacture... |
|
Flush Out Path 1 Only During DaytimeNC-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Esteban Martinez on Apr 29, 2014, 6:34 pm
We are currently pursuing this credit using the flush out option Path 1. We are capable of maintaining the temperature in at least 60°F and RH no higher than 60% since the ventilation systems are... |
|
Pest Control During ConstructionPilot-Credits IPpc81: Green training for contractors, trades, operators and service workersposted by Abena Darden on Apr 29, 2014, 8:50 pm
I seem to remember coming across a credit similar to the clean construction pilot credit, but geared to specific environmentally benign pest control measures practiced during construction. This... |
|
Pest Control During Construction?Pilot-Credits SSpc75: Clean constructionposted by Abena Darden on Apr 29, 2014, 8:51 pm
I seem to remember coming across a credit similar to the clean construction pilot credit, but geared to specific environmentally benign pest control measures practiced during construction. This... |
|
LEED BoundaryCS-2009 PIf4: Schedule and Overview Documentsposted by CT G on Apr 30, 2014, 3:10 pm
We are working on a project that includes a building and open space surrounding it. Part of the open space is a vegetated area that the project owner is developing but that will be transferred to... |
|
SSc10 as an ID strategy in NCNC-2009 IDc1: Innovation in Designposted by Tiffany Moore on Apr 30, 2014, 5:24 pm
Under the category of borrowing credits from other rating systems, I am looking at the potential to use the "Joint Use of Facilities" credit from Schools as an ID credit for NC. The... |
|
PC 9- Open & Connected CommunityPilot-Credits PC9: Street Networkposted by Michael Kollman on May 1, 2014, 11:00 am
It seems like this is a useful metric to measure pedestrian options in the spirit of quantifying alternatives to vehicular travel. In our case, an infill suburban site in the Chicago area, we... |
|
Verification of pressure differenceNC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by Francisco Aguirre on May 5, 2014, 10:55 am
Hi all, We are developing a NC Campus project located in the Arab Gulf. Refering to the need of verify the pressure differentials between the smoking room and the surrounding areas and as... |