Log in
Forum
Topic

Shoe removal and storage space in place of walk off mats

NC-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by John Covello on Apr 25, 2014, 3:20 am

Hello,

I am with a sustainable resort project in Thailand. Our project has designed shoe storage space in the front of each guest room instead of having walk off mats. LEED Homes 2008 EQ...

Choice between LEED NC & LEED HC

LEED for Healthcare forum
posted by Maya Karkour on Apr 28, 2014, 11:55 am

Dear All,

We have a potential hospital outside the US which needs to be registered under LEED. The building will be a fully functioning hospital (including surgery rooms and ~400...

Concerning ANSI/BIFMA manufacture date

CI-2009 IEQc4.5: Low-emitting materials - systems furniture and seating
posted by Jaida Anderson-Lozano on Apr 29, 2014, 7:25 am

Currently our furniture products use Greenguard Certificates and ANSI/BIFMA testing standard as compliance paths for this credit. When we complete the table IEQc4.5-1 in LO columns 'manufacture...

Flush Out Path 1 Only During Daytime

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Esteban Martinez on Apr 29, 2014, 6:34 pm

We are currently pursuing this credit using the flush out option Path 1. We are capable of maintaining the temperature in at least 60°F and RH no higher than 60% since the ventilation systems are...

Pest Control During Construction

Pilot-Credits IPpc81: Green training for contractors, trades, operators and service workers
posted by Abena Darden on Apr 29, 2014, 8:50 pm

I seem to remember coming across a credit similar to the clean construction pilot credit, but geared to specific environmentally benign pest control measures practiced during construction. This...

Pest Control During Construction?

Pilot-Credits SSpc75: Clean construction
posted by Abena Darden on Apr 29, 2014, 8:51 pm

I seem to remember coming across a credit similar to the clean construction pilot credit, but geared to specific environmentally benign pest control measures practiced during construction. This...

LEED Boundary

CS-2009 PIf4: Schedule and Overview Documents
posted by CT G on Apr 30, 2014, 3:10 pm

We are working on a project that includes a building and open space surrounding it. Part of the open space is a vegetated area that the project owner is developing but that will be transferred to...

SSc10 as an ID strategy in NC

NC-2009 IDc1: Innovation in Design
posted by Tiffany Moore on Apr 30, 2014, 5:24 pm

Under the category of borrowing credits from other rating systems, I am looking at the potential to use the "Joint Use of Facilities" credit from Schools as an ID credit for NC.

The...

PC 9- Open & Connected Community

Pilot-Credits PC9: Street Network
posted by Michael Kollman on May 1, 2014, 11:00 am

It seems like this is a useful metric to measure pedestrian options in the spirit of quantifying alternatives to vehicular travel. In our case, an infill suburban site in the Chicago area, we...

Verification of pressure difference

NC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Francisco Aguirre on May 5, 2014, 10:55 am

Hi all,

We are developing a NC Campus project located in the Arab Gulf. Refering to the need of verify the pressure differentials between the smoking room and the surrounding areas and as...