Topic | Recent |
---|---|
Help needed: Process Energy / Water- 25% Default vs. ActualNC-2009 EAc1: Optimize Energy Performanceposted by Dan Prows on Feb 10, 2010, 4:09 pm
We have a child care center in the SE US. We did very well on envelope, lighting, and mechanical design (53% reduction in those areas). The building has a commercial kitchen with several... Last reply: Marcus Sheffer, Sep 23, 2011, 9:23 am |
|
Private lavatory faucetCI-2009 WEp1: Water Use Reductionposted by Sundararaj Subburaman on Jun 17, 2011, 2:29 am
Hi, We have a project that consists of an office space, a laboratory, and a salon area for testing health care products. Kindly advice if the water fixtures in the salon area has to be... Last reply: Sundararaj Subburaman, Sep 23, 2011, 1:05 am |
|
Required Signatory- ContractorNC-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by jacque decker on Sep 22, 2011, 5:56 pm
Hi, Last reply: Nadav T. Malin, Sep 22, 2011, 7:49 pm |
|
check with GBCIGeneral forumsposted by Tristan Roberts on Sep 22, 2011, 3:24 pm
Brian, I am not familiar with how to deal with this issue. From what I know about LEED Online, you may have to send new invites or even start over at an earlier point. I would check with... Last reply: Brian Wolfe, Sep 22, 2011, 6:12 pm |
|
calculating solar / mechanical square footageNC-2009 SSc7.2: Heat island effect - roofposted by Gita Nandan on Jan 5, 2011, 12:38 pm
in calculating the 50% area of a roof to be installed with a green roof for this credit, one can deduct the mechanical area and area covered by solar systems. in our project, our solar array is... Last reply: Michelle Teague, Sep 22, 2011, 6:11 pm |
|
LEED and ErgonomicsPilot-Credits EQpc44: Ergonomics approach for computer usersposted by Linda Miller on Sep 22, 2011, 4:47 pm
Seeking your Input: Does your organization have a policy pertaining to Leadership in Energy and Environmental Design (LEED)? This study may be for you, we are examining how ergonomics is... |
|
Garage and technical roomsNC-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by BH . on Aug 30, 2011, 10:01 am
Hello, We are dealing with project with underground garage, where adjacent spaces are technical rooms. Can we transfer the air from the garage to the technical rooms to ventilate them? Do... Last reply: Dylan Connelly, Sep 22, 2011, 3:01 pm |
|
Option 1: Full Flush-out Before Occupancy- Is there a Min. CF?CI-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Michelle Bracewell-Musson on Aug 4, 2011, 10:50 am
With Option 1, Path 1, we are expected to flush-out 14,000 cf/sf of outdoor air at 60 degrees temp. and 60% humidity min. Is there a minimum ventilation rate as with Path 2 which is 0.30 cf/min... Last reply: Dylan Connelly, Sep 22, 2011, 11:37 am |
|
Public LEED Project DirectoryGeneral forumsposted by Amber Sausen on Sep 21, 2011, 6:38 pm
Did you look at the certified project directory provided by USGBC? http://www.usgbc.org/LEED/Project/CertifiedProjectList.... Last reply: Sheela I, Sep 22, 2011, 11:34 am |
|
Outdoor Air Delivery Monitoring System installed post-occupancyCI-2009 IEQc1: Outdoor Air Delivery Monitoringposted by Philip Herriges on Aug 23, 2010, 6:22 pm
Our building owner is having a building-wide outdoor air delivery monitoring system installed throughout the building (not just in the LEED-tenant area of our project) but it won't be installed... Last reply: Dylan Connelly, Sep 22, 2011, 11:24 am |