Topic | Recent |
---|---|
MRc2 Construction Waste ManagementCI-2009 MRc2: Construction Waste Managementposted by Michael Roth on Jan 29, 2018, 4:21 pm
I have comingled waste and diverted metals. One recycler sorts CMU,... Last reply: RETIRED, Feb 8, 2018, 4:55 pm |
|
Aerobic Digester for a LEED credit?NC-v4 INc1: Innovationposted by Harry Flamm on Jan 31, 2018, 3:32 pm
On a university residential/dining hall project, we will be utilizing an "Eco-Digester", (an aerobic digester from BioHiTech), http://... Last reply: Han Qiang Ler, May 14, 2019, 1:37 am |
|
step controls per Section 9.4.1.2aNC-v4 EAp2: Minimum Energy Performanceposted by Francesco Passerini on Feb 8, 2018, 9:43 am
The v4_Minimum Energy Performance Calculator_v05 states that "Mandatory step controls are included in the proposed, and modeled in the baseline for all spaces enclosed by ceiling height... Last reply: Francesco Passerini, Feb 15, 2018, 3:15 am |
|
healthcare vs new constructionLEED Rating System Selectionposted by maryam sadia on Feb 10, 2018, 4:14 pm
why certain hospitals are certified under new construction or core and shell instead of healthcare ?? Last reply: Susan Walter, Jan 24, 2019, 1:53 pm |
|
Grout RequirementsCI-v4 EQc2: Low-emitting materialsposted by Michelle Rosenberger on Feb 12, 2018, 4:40 pm
Does grout still need to meet low emitting requirements? If so, both... Last reply: Stacey Olson, Apr 7, 2023, 3:09 pm |
|
Preferred parking/ Charging stations allocated off- siteNC-v4 LTc8: Green vehiclesposted by on Feb 14, 2018, 2:04 pm
We have a project on a university campus that will have no new parking associated with the project. However, the design team is hoping to achieve points for LTc8. Can the project add preferred... Last reply: Emily Purcell, Mar 13, 2019, 5:07 pm |
|
Hotel HVAC (electric) and DHW (gas) systemsNC-2009 EAp2: Minimum Energy Performanceposted by Ricardo Sá on Feb 22, 2018, 10:48 am
Am I right to assume in the baseline building: 1 - The use of HVAC system 2 for all hotel spaces since it is considered a "Residential" building (according to table G3.1.1A of ASHRAE90.1-... Last reply: Marcus Sheffer, Feb 27, 2018, 9:25 am |
|
Water Coil Sizing, heating and coolingNC-v4 EAp2: Minimum Energy Performanceposted by Giuseppina Amorusi on Mar 5, 2018, 4:53 am
Hi all! I have a problem with water coil sizing. I set the following parameters for cooling and heating: Coil:Cooling:Water,... Last reply: Marcus Sheffer, Mar 8, 2018, 9:50 am |
|
Lighting densityNC-2009 EAp2: Minimum Energy Performanceposted by Sivarajah Ragulakeethan on Mar 6, 2018, 5:12 am
Hi, I am working on a core and cell project, There are some spaces don't have lighting power (o kw) such as void, lift (not lobby), escalator, duct and etc. How to select the space type... Last reply: Marcus Sheffer, Mar 7, 2018, 9:23 am |
|
Looking for a source for free BD&C specific CEUsLEED Recertification: When and Howposted by Phil Vanderloo on Mar 8, 2018, 5:04 pm
Does anyone know of any resources for this? Everything I'm finding that's BD&C specific is a paid course. Thank You Last reply: Nadav Malin, May 16, 2018, 6:08 am |