hi everyone,
i m working on project where there is a security check point seperate from the original building and a single floor entrance attached to the 3 floor building. now , while calculating the heat island -roof for this project; are these two diffrent roofs going to be included in the total roof area?
thanks!
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Go premium for
Jon Clifford
LEED-AP BD+CGREENSQUARE
LEEDuser Expert
327 thumbs up
August 5, 2014 - 10:13 am
Merhaba!
If the project boundary includes two roofs, the calculation should include both.
Bir şey değil. İyi şanslar!
esra ozkonuksever
architectiltay mimarlık
August 5, 2014 - 3:54 pm
thanks a lot !' teşekkür ederim