Topic | Recent |
---|---|
Indoor TurfNC-2009 IEQc4.3: Low-emitting materials - flooring systemsposted by Martha Norbeck on Jun 18, 2013, 4:40 pm
Does anyone have any experience with a compliant indoor turf flooring? Thanks! |
|
Does anyone out there knowSchools-2009 EAp2: Minimum Energy Performanceposted by Ema S on Jun 20, 2013, 5:34 pm
Does anyone out there know what the following comment pertains to: |
|
Document ALL items?NC-2009 MRc7: Certified Woodposted by Jamie Abernethy on Jun 24, 2013, 2:09 pm
If I take the default 45% of contract price for divisions 3-10 just in the concrete and steel my totals are 80% plus for... |
|
WEpc10 through use of cisternPilot-Credits WEpc10: Sustainable wastewater managementposted by Joanna Switzer on Jun 24, 2013, 5:53 pm
Hello, Latest one of my projects pursuing this pilot credit is a daycare facility. Adult toilets are low flow, but child sized toilets are standard 1.6gpf. There are no urinals included in... |
|
Major Advancement in Energy PerformanceGeneral forumsposted by Scott Bowman on Jun 24, 2013, 6:09 pm
I have also voted as a qualified YES. While I have serious concerns over some of the changes made in the... |
|
Street treesPilot-Credits PC14: Walkable Streetsposted by Florian Schmidtchen on Jun 25, 2013, 4:04 am
How is distance between street trees measured? From center to center or from the border of the crown to the next crown border? And has the average distance to be 12 m (or is it 15m ), or has... |
|
Surface Water Management CreditsLEED for Homes (LEED-H) Forumposted by Eva Pong on Jun 25, 2013, 5:42 pm
(Credit 4.1 states: 'Design the lot such that at least 70% of the buildable land; not including area under roof, is permeable or designed to capture water runoff for... |
|
Multiple Buildings QuestionGeneral forumsposted by Lawrence Lile on Jun 27, 2013, 10:29 am
I have a similar situation to the post above. We are constructing 3 buildings - a solid waste administration building, a vehicle maintenance building, and a parking facility which includes slow-... |
|
Reference BuildingPilot-Credits MRpc63: Whole building life cycle assessmentposted by Mark Webster on Jun 27, 2013, 10:46 am
How have project teams been defining the reference building for this credit? |
|
Access to Public SpacesPilot-Credits PC14: Walkable Streetsposted by Jennifer Preston on Jul 1, 2013, 1:03 pm
Is there a requirement or guideline as to how far from the project site the public spaces/squares/plazas need to be? We are assuming that they should be within 1/4 mile to 1/2 mile radius and... |