Topic | Recent |
---|---|
Energy-Star equivalent productsCI-2009 EAc1.4: Optimize energy performance - equipment and appliancesposted by R G on Aug 11, 2014, 2:40 pmMarcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5916 thumbs up August 11, 2014- 2:47 pm I think that there has been a number of posts in the forum related to demonstrating equivalency between Energy Star and other standards, you should attempt to do so. Focus on energy use. Log in or register to post comments Suzanne Painter-Supplee, LEED AP+ID&C Principal SEESolutions LLC LEEDuser Basic Member 126 thumbs up August 11, 2014- 6:39 pm You didn't say which appliance categorty, but....IF it is commercial kitchen equipment, most manufacturers will have 50 cycle spec sheets... Last reply: Geraldine Assmus, Aug 21, 2015, 10:25 am |
|
Glass manifestationCI-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Akos Brandecker on Sep 8, 2014, 8:45 am
Does anyone know if glass manifestation (decorative films on glass panels) applied on-site falls under any of the IEQ credits and if yes, what requirements it has to meet exactly? Thank... Last reply: Akos Brandecker, Sep 8, 2014, 11:51 am |
|
Fixtures included in WEp1.CI-2009 WEp1: Water Use Reductionposted by Bernardo Ruiz Montoya on Dec 2, 2014, 10:24 am
Hi, I believe that I already know the answer but I want to present my doubt to you as a double-check. Turns out I'm working on a CI project that only installed kitchen sinks within the... Last reply: William Weaver, Dec 2, 2014, 11:09 am |
|
Optimize Energy Performance-HVAC-CI-2009 EAc1.3: Optimize energy performance - HVACposted by Gustav Alfaro on Jan 26, 2015, 8:20 pm
Hi, I have a couple of questions regarding EAc1.3 1. Our HVAC design includes VRF systems that are compliant with sections 1.4 and 2.9 of the Core Performance Guide, but those systems don... Last reply: Gustav Alfaro, Jan 27, 2015, 2:51 pm |
|
Enter way/Filling out the FormCI-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by Bridgett Weaver on Apr 27, 2015, 12:54 pm
Working on a project that the occupancy of the building is a multi-tenant. Would the project still be able to receive this credit, if the entryway / walk off mats are not apart of the project... Last reply: Michelle Halle Stern, Apr 30, 2015, 10:50 am |
|
Rated powerCI-2009 EAp2: Minimum Energy Performanceposted by Yaser Al Sharif on May 19, 2015, 10:45 am
From where can i take rated power for equipments like laptop , i read it on laptop about 55wh then i divded it by work hours give me 6.7watt , is that right ?????? Last reply: Marcus Sheffer, May 20, 2015, 12:51 pm |
|
EAp2-4: Energy Star equipment: conversion from kWa to WattsCI-2009 EAp2: Minimum Energy Performanceposted by Sarah Simchuk on May 19, 2015, 6:01 pm
I'm attempting to register the energy star equipment for my project under Table EAp2-4. The table asks for... Last reply: Marcus Sheffer, May 20, 2015, 2:14 pm |
|
Private BathroomsCI-2009 WEp1: Water Use Reductionposted by Susan Coy on Aug 4, 2015, 10:57 am
Hi, Last reply: Carlie Bullock-Jones, Oct 26, 2017, 7:49 am |
|
SCS Global CertificationCI-2009 IEQc4.5: Low-emitting materials - systems furniture and seatingposted by Steve Valev on Aug 31, 2015, 2:54 pm
Most of the furniture selections in out project have a certification from SCS Global which is an ANSI Accredited Product Certification. Is this an acceptable substitute to Greenguard? If... Last reply: Michael Munn, May 14, 2019, 5:34 pm |
|
Relocated / Occupant owned task lightingCI-2009 EAp2: Minimum Energy Performanceposted by Michael Smithing on Oct 14, 2015, 2:18 am
Our project does not include task lighting; however several users have brought existing task lighting with them from the previous premises to the new premises. It is unclear whether the task... Last reply: Marcus Sheffer, Oct 15, 2015, 4:11 pm |